Category Archives: Montréal Architecture

Children’s Hospital Field at Cabot Square®

Ceci n'est pas une stade de baseball...
Ceci n’est pas une stade de baseball…

Urban development news of the day: the former Montreal Children’s Hospital building at Cabot Square has been sold to real estate developer Luc Poirier for an undisclosed sum. The MUHC’s asking price, as reported a few months back, was about $45 million, though neither Poirier or the MUHC would confirm the value of the transaction (which is odd given that we’re talking about a public building and everyone’s talking a good game these days about transparency… but I digress).

Luc Poirier also won’t specify exactly what he has in mind for the site, though he hinted strongly at a baseball stadium. Apparently he has an important meeting this week with someone of significance vis-a-vis the much bandied about plan to return professional baseball to the city.

Now before we get ahead of ourselves, nothing is set in stone. The deal won’t be official for another three months, at which time the public will be told how much the hospital sold for. Poirier has no specific plan for the site. Inasmuch as he indicated he believes it’s an ideal site for a downtown ballpark, he remains open to myriad other potential uses. He offered condos, offices or a seniors residence as possibilities. That being said, his plan involves demolishing the six buildings that comprise the hospital complex, as he believes the buildings are insufficient as is for housing.

As to a professional baseball stadium, Poirier was very candid in stating a new ballpark would require not only demolishing the hospital buildings, but further would require expropriating at least some of the streets and public spaces (i.e. the newly renovated Cabot Square and Place Hector-Toe-Blake and Place Henri-Dunant) that surround the hospital complex.

Ergo, not only does the public lose institutional space in the form of a hospital, but further loses three parks. Cabot Square just received a $6.3 million renovation, paid for by the city. If Poirier’s plan for a baseball stadium gets the green light, it would not only waste that sum but further require extensive city involvement, consuming public tax dollars for a private interest.

Assume the new ballpark would occupy the grounds of the former Children’s Hospital, the three aforementioned parks and public spaces, as well as Sussex, Hope, Tupper and Lambert Closse streets. The city would have to plan for the loss of those side streets, not to mention re-locate the bus terminus co-located at Cabot Square. If you thought there wasn’t enough parking in downtown Montreal to begin with, imagine the loss of those parking on those streets compounding additional parking requirements on game days.

Even if Poirier plans for an extensive excavation of the land to build a massive underground parking garage to compensate for parking demands, building a ballpark on this site will still require additional roadwork on Atwater, Sainte-Catherine and René-Lévesque to accommodate higher traffic loads. I can’t imagine how the city could this and also somehow make Sainte-Catherine more pedestrian friendly simultaneously.

A major advantage of course would be that this location would provide immediate access to Atwater Métro station, which would in all likelihood help mitigate traffic congestion (though by no means would it eliminate it). Atwater is an ideal Métro station because it was designed from the outset as a high-capacity inter-modal transit station (Bus/Métro) adjacent to a major sporting and performance venue (the Forum). But we could count on congestion there too. If the exhibition games at the Olympic Stadium over the past two years were any indication, the Green Line would slow down considerably on game days (though this would be mitigated at least in part with people opting to disembark either at Lionel-Groulx or Guy-Concordia). All told, it’s not a bad location strictly in terms in terms of access to public transit infrastructure.

But the project’s various public costs can’t be overlooked simply because the stadium will be Métro station adjacent.

My major concern is the immediate effect a stadium will have on residential and retail rents in the Shaughnessy Village area. My fear is that commercial rents will rise very quickly, forcing out small businesses and replacing them with theme restaurants, high-capacity sports bars (à la Sergakis) and tacky souvenir stands. Residential rents will also rise, eventually leading property owners to convert their properties into condominium towers, which in turn would likely force out many residents.

***

The latest word is that the city is not keen on Mr. Poirier’s plan.

Richard Bergeron, formerly the leader of Projet Montréal and now Coderre’s right-hand man on all aspects of downtown redevelopment, said he’s not in favour and that the city is not ready to sacrifice public spaces and streets for a ballpark.

Bergeron also noted that the Children’s Hospital site, though promoted by Ernst & Young in their feasibility study, is not the first choice for the Montreal Baseball Project, which in turn prefers the Peel Basin.

Bergeron also stated that yet another site had been pitched to City Hall – that of Maison Radio-Canada’s extensive parking lot. Bergeron suggested the western lot, which runs between René Lévesque Boulevard and the Ville Marie Expressway along Wolfe. The eastern lot is much larger, but might not be as feasible simply as a result of congestion on Papineau (police operate the traffic lights manually on much of Papineau throughout the day).

All that being said, this proposal makes much more sense to me. For one, no expropriations of public space nor demolitions of any heritage structures; the lots currently constitute empty space. A ballpark at this location would still require excavations and a significant underground parking facility, but wouldn’t ‘spill over’ into the surrounding streets such as it would over at the Children’s. Even though this would also be a small-sized ballpark, there could be some integration with Maison Radio-Canada, such as incorporating seating atop the complex’s westernmost studios, if extra space is required.

Other benefits of this location: adjacent to established entertainment districts (i.e. Gay Village, Old Montreal) though not immediately next door. Four Métro stations within a five minute walk, including the Berri-UQAM, not to mention highway and bridge access. Fringe benefits: CBC/Radio-Canada and Molson gets free advertising.

All that being said, I’m anxious to find out who Mr. Poirier was supposed to meet with and what those discussions lead to.

Denis Coderre needs to stop spending money on parks

City of Montreal plan for the renovation of Place Vauquelin
City of Montreal plan for the renovation of Place Vauquelin

Another week, another colossal waste of our municipal tax dollars.

Tuesday’s announcement: $12 million to renovate Place Vauquelin, the public square between City Hall and the Old Courthouse. Among the many exciting new features: a redesigned fountain, heated granite paving stones and, as the Gazette reports ‘the return of the massive Christmas tree for the holiday period.’

Apparently the province will kick in $3.5 million, and it’s supposed to be completed by December of next year.

I won’t hold my breath… the Coderre administration so far is as well known for constantly pitching the inevitable return of the Montreal Expos inasmuch as their total inability to execute urban renovation projects on time or on budget. Coderre routinely over-promises and under-delivers, despite his ‘hands-on’ approach to dismantling poured concrete…

Given his administration’s track record with the Mordecai Richler Gazebo, Peel Street infrastructure repairs, Place du Canada’s multi-year $10-million renovation (not to mention the stalled Viger Square project and the plan to cover over part of the Ville Marie Expressway), we would wise to ask Mayor Coderre to simply stop undertaking any renovations of public spaces, and leave that to whomever his successor might be.

Place Vauquelin
Place Vauquelin

Moreover – $12 million to redo Place Vauquelin is excessive as is, and we’re assuming, with cause, that it will ultimately cost even more. How much can we really afford to spend on city beautification?

Don’t get me wrong – I want to live in a beautiful city with many well-maintained, well-conceived public spaces.

But don’t forget as well – we’re living in a time of austerity, or at least we’re supposed to be. All levels of government have indicated time and again since the Crash of 2008-09 that budget cuts are necessary so as to lower the debt, and that this, along with tax breaks for the wealthiest of citizens and corporations, will help revive our lagging economy.

Our economy is still lagging, and spending municipal tax dollars on city beautification projects is not the kind of economic stimulus we need.

Moreover, the underlying problem is – and always has been – that the people have no apparatus to measure government budgetary efficiency. There is no constant public audit of the spending habits of the City of Montreal, and we accept the city’s cost estimates for various projects without the means to judge whether these costs are reasonable or justifiable in the first place.

Take the Mordecai Richler Gazebo example: the Cadillac of modern gazebos, locally sourced, clocks in at a cost of about $25,000. Such was offered to the city, as well as the cost of construction, pro bono by a local entrepreneur a couple of months back. The mayor declined the offer, stating (weakly I might add) that the Richler Gazebo is a heritage structure and as such the current cost estimate of $592,000 is appropriate. It is already well-known Mordecai Richler never wrote of (or in) the gazebo that will bear his name, and by my estimate about half the total sum is linked to the city commissioning ultimately incomplete studies relating to the history and heritage of the structure. Information that was already publicly available, that any university student could easily have prepared in a report, could have saved this city at least a quarter-million dollars in costs associated with this project, and would have made a compelling argument in favour of simply demolishing it.

Derelict riverside park near Place des Nations
Derelict riverside park near Place des Nations

Another example: the $70 million renovation of part of Parc Jean-Drapeau to facilitate large open-air concerts is not only an egregious waste of taxpayer dollars, it will likely wind up exclusively benefitting concert promoters. The project is intended both to create a permanent outdoor amphitheatre as well as a new promenade to link Calder’s Man with the Métro station. Additional support facilities, like public toilets and vendor kiosks, would likely be integrated into the plan. But the project won’t be completed in time for the city’s 375th anniversary in 2017 (in fact it’s due to open in 2019) and the economic benefits to the city are dubious at best. Parc Jean-Drapeau may be part of the city’s ‘tourism sector’, but the nature of these massive outdoor concerts tends to concentrate most of their economic activity to the immediate environs of the concert. Put another way, you’re probably not going to have dinner in the Old Port if you’ve spent your day at Osheaga or Heavy MTL, and this is quite the contrary of the city’s other, more urban music festivals (like the Jazz Fest or Francofolies, which provide direct economic stimulus to the restaurant and hotel industries across a far larger area of the city). What’s particularly onerous about this proposal is that a) there aren’t that many massive touring outdoor concert festivals to begin with, b) the existing space is already adequate given the limited need and c) Parc Jean-Drapeau already has a purpose-built outdoor amphitheatre, and it’s a derelict heritage structure to boot.

But wait, there’s more!

In January of 2014 the management corporations of both Parc Jean-Drapeau and the Quartier international de Montréal put together a project that sought to spend $55 million on a comprehensive renovation of Parc Jean-Drapeau in time for the 375th anniversary. At the time, the plan called for $12.5 million to be spent renovating and rehabilitating Place des Nations, $22.5 million to be spent building a three-kilometre long riverside promenade around both Ile Sainte Helene and Ile Notre Dame, $15 million on a new central promenade connecting the Métro station to Calder’s Man, and only $5 million to improve the open-air concert venue.

So in the span of just under two years the Parc Jean-Drapeau renovation project has increased in cost by more than $15 million and has been downgraded in terms of its scope (Coderre’s recent announcement seems to only include the Calder promenade and the infrastructure for a larger capacity and more permanent outdoor concert venue; there was no mention of Place des Nations or a riverside promenade). In addition, a larger and less expensive project that would have completed in time for the city’s 375th anniversary is now only estimated to be completed two years later.

This is not an efficient use of municipal tax dollars, nor is it demonstrative of efficient urban planning.

Place Vauquelin, Viger Square, Place du Canada, Place des Nations and that wretched gazebo all fell into disuse and disrepair because they were not adequately maintained, as administrations from decades ago sought to cut costs for reasons that would be familiar to us today. Montreal has gone through several cycles of concentrated spurts of investment into massive urban beautification projects, most recently to celebrate oddball anniversaries (375th two years from now, 350th back in 1992, but the cycle goes back to Expo 67 and the 1976 Olympics as well), followed by prolonged periods where maintenance budgets are cut back to the bone. This is an advantageous situation for politicians and private contractors alike – every other mayor can triumphantly proclaim major investments of public funds to demonstrate that, unlike their penny-pinching predecessors, they are truly working to push the city forward, wisely investing public funds in large-format public works programs.

It all has the allure of being good for the economy but it’s all just an illusion.

***

Coderre announced Thursday, from the trade mission he’s on in China (?), that there will be consequences for those responsible for driving the cost of the gazebo renovation project up to $592,000, and also provided the nebulous quotation: “…but trust me, I’m not going to spend too much money on that one.”

Your guess is as good as mine as to what precisely that means.

Sabotaging Viger Square

Rule no.1 of building a park: make it open and accessible. If this staircase drew shady characters, install better lighting.
Rule number 1 of building a park: make it open and accessible. If this staircase draws shady characters, install better lighting.

Here’s a hypothetical situation:

A city builds a park costing x millions of dollars with the intent to rehabilitate a given sector of its urban environment and cover over an exposed highway trench. It hires leading landscape architects and local artists to develop a master plan for the park and then sets about building it. At some point in time between the beginning of construction and the new park’s opening day, the city changes fundamental aspects of the master plan and eliminates others with an aim to lowering overall projected costs, claiming the initial vision developed by the relevant experts was too expensive.

Smart politics: a park gets built and various officials make claims they got the job done under budget.

The park opens and then for the better part of the next thirty some-odd years the city a) stops fully maintaining the park and b) actively sets about removing the park’s infrastructure – benches, garbage bins, picnic tables, fountains, lighting etc.

At first I thought this odd arrangement of cement boxes was part of the art. When I noticed this pattern repeated itself throughout Viger Square,  I realized this is where the benches were located. The big box was for garbage.
At first I thought this odd arrangement of cement boxes was part of the art. When I noticed this pattern repeated itself throughout Viger Square, I realized this is where the benches were located. The big box was for garbage.

After thirty years the city proposes to demolish the old park and replace it with an entirely new park costing y millions of dollars because the park has become undesirable in the intervening thirty-year period. The city argues the park is considered undesirable because a semi-permanent homeless population now lives there, and that the solution to both the park’s undesirability and (somehow) the homeless camp is to spend public money on building a new park (and not a new homeless shelter).

The considerable open space and unique architecture of the Agora would make it an ideal location for public performance.
The considerable open space and unique architecture of the Agora would make it an ideal location for public performance.

This is the situation with Viger Square; the city of Montreal intends to spend public money building a new park to replace the one they – for lack of a better word – sabotaged. Though Denis Coderre seems to have backed off a bit after considerable public outcry from preservationists, urbanists and the family of one of the people responsible for Viger Square’s design, there’s little doubt in my mind the political intent is fundamentally misdirected. As of this writing the proposal presented at the beginning of June has been rejected, more or less at the eleventh hour, after Coderre decided the project was unsatisfactory. Still, he qualifies the park as ‘a bunker.’

Initially panned by critics for excessive use of cement, the pergolas are now covered in ivy, giving sections of Agora the feeling of a vineyard.
Initially panned by critics for excessive use of cement, the pergolas are now covered in ivy, giving sections of Agora the feeling of a vineyard.

Up until quite recently the city’s plan called for the destruction of a significant work of homegrown landscape architecture and sculpture to replace it with something banal and unimaginative at a cost of $28 million. This is your money. It was your money that financed the extant Viger Square as well. The idea that we should pay a considerable sum (think of how many new elementary schools $28 million could build) to tear down a fine example of local landscape architecture and sculpture so that the CHUM can have a nondescript ‘front yard’, and then further to lay the blame for the park’s disfunction on its design, rather than the city’s perpetual disinterest in adequately maintaining it, is simply inexcusable.

Rule number 2 of building a park: if the main attraction is a fountain and pool arrangement, turn the water on.
Rule number 2 of building a park: if the main attraction is a fountain and pool arrangement, turn the water on.

Without question renovation and rehabilitation is the best way forward for Viger Square, but this doesn’t mean starting from square one. Elements of the original design, such as a café kiosk, or a public market, could be easily integrated into what’s already built, and would serve to draw new interest to the square.

Again, this works better when the tap is turned on.
Again, this works better when the tap is turned on.

But what drives me up the wall is that the simplest and least expensive solution would be not to add anything at all; fixing Viger Square is as straightforward as making the fountains work, re-installing park furniture and picking out the weeds. While there’s considerable debate concerning the application of the ‘broken windows theory’ by law enforcement, the idea that a well-maintained urban environment serves to dissuade petty criminality and attract respectable public usage is fairly sensible. If we don’t want our parks and public spaces to become open air drug markets and homeless camps, then we need to ensure these spaces are well-maintained as a bare minimum. It’s common sense.

Rule number 3 of building a park: do not remove the benches.
Rule number 3 of building a park: do not remove the benches.

As is, Viger Square is roughly as well-maintained as Place des Nations, which is to say the grass gets cut and that’s about it. As I mentioned previously, someone had the bright idea to remove all park benches and cover over all the garbage cans. No wonder people don’t go there to relax and read a book. Neither of the large fountains, arguably the main attractions to the square, work, nor do the smaller drinking stations. Weeds grow through the cracks of uneven paving stones, metal drains are broken, a waterfall, long since deactivated, has been painted blue. The only flowers I noticed were planted along the periphery; inside the square there are no gardens to speak of. And the periphery is probably the square’s single greatest problem – cement walls disconnect the squares from the street and provide too sharp a distinction from the surrounding urban environment. Removing these could do a lot to change the park’s fortunes.

There's no good reason for this wall. Removing it would  improve pedestrian access to the square.
There’s no good reason for this wall. Removing it would improve pedestrian access to the square.

But if we want a sustainable solution to Viger Square’s homeless population, then the city should consider acquiring the former CHSLD Jacques-Viger, located in the SÅ“urs de Miséricorde Institute at 970 René Levesque East (a stone’s throw from Viger Square and the CHUM). The building is a threatened heritage site that was originally built as a convent and hospital complex, and was then used as a long-term care facility. This would be an ideal location for the CHUM’s public outreach programs, and could easily serve as a homeless shelter, and that’s ultimately what’s needed to make Viger Square inviting again. Closing the square for renovations will force the displacement of the homeless temporarily, but without better services and more beds to get the homeless off the streets, we’re either just delaying the inevitable return of homeless camps to Viger Square, or are displacing them to another public space.

This man deserves better than this. We have $28 million to build a park, but nothing to help him?
This man deserves better than this. We have $28 million to build a park, but nothing to help him?

Rehabilitating the square is a good idea, but we don’t need to reinvent the wheel. We do need to look beyond the mere aesthetics of the park, however, and address the core problem of lacking services for the homeless and transient population. This is why we should start thinking of Viger Square and the SÅ“urs de Miséricorde Institute as inter-related urban rehabilitation projects. As inexcusable as bulldozing Viger Square without acknowledging the city’s role in its demise is, it is unconscionable for the city to displace the only people who have made any use of it, leaving them to continue sleeping outside when a usable building stands just up the street.

Currently nothing but an occasional bird bath.
Currently nothing but an occasional bird bath.

Cabot Square Redux: not quite paradise, kind of a parking lot…

This used to be much greener; the interior of Cabot Square is now paved over in a special kind of asphalt
This used to be much greener; the interior of Cabot Square is now paved over in a special kind of asphalt

After about a year’s worth of work, Cabot Square re-opened to the public on Wednesday July 8th.

The major improvement involves two outreach workers who will now use the square’s renovated stone kiosk (vespasienne) as home base to provide services to the primarily Aboriginal homeless community that (up until the renovations began) called Cabot Square home. Whether this homeless population returns to spend their time in Cabot Square remains to be seen, but the mere fact that these outreach workers have their own workspace within the square is in and of itself a progressive step in the right direction. From what I’ve read, the kiosk will also serve as a café where the proceeds will support the homeless (or the outreach program that helps the homeless). This is also good – Montreal is well known for its dearth of coffee-purchasing opportunities…

Other improvements: apparently there’s daily programming (music, dance, theatre) organized throughout the summer, and free wifi. I have a greater interest in the latter rather than the former, but again, glad to see it and I hope these activities are well-attended.

However, as you can see in the above photo, much of the square has been covered over in a slick ‘water-permeable ground covering’ that looks an awful lot like asphalt and for that reason looks awful.

Green space in Cabot Square is now defined by oversized curbs
Green space in Cabot Square is now defined by oversized curbs

This is not to say that the square was completely paved over – just that too much of it was. The paved portion flows around ‘green islands’ – there are now several such ‘islands’ in the newly renovated square, sharply divided from the walking paths with large curbs that integrate a few benches and subtle anti-skateboarding dimples. Within the green islands, plants surrounding the bases of several trees. Elsewhere in the square, younger trees planted to replace those removed during the renovation are surrounded by small circles of wood chips.

The division between green and grey isn’t subtle – it’s very clear where you’re supposed to walk and where you’re not.

There’s almost no grass per se, no flowerbeds either. In its previous incarnation, there were patches of grass and no physical barrier between the somewhat symmetrical paving-stone walking paths and the green space.

The new arrangement reminds me of a trip to the Biodome; nature in the new Cabot Square is ‘grade-separated’ – look, but don’t touch seems to be the overriding design philosophy, which is ironic given how Aboriginal politics often involves efforts to sustain our interactions with the natural environment (i.e. preservation with an aim towards common appreciation etc.)

While there’s no doubt the new Cabot Square is slick, clean and modern, it’s also much less of a park. It feels more like a transit point than an urban refuge, and this is odd given that there’s so much less going on around Cabot Square these days (i.e. the Forum closed in 1996, the Children’s Hospital just relocated and the square isn’t the major bus terminus it once was). Considering there are plans to increase residential density in the area by building more condo towers and apartment buildings, I figured city planners would have gone in a different direction, aiming to provide an urban refuge instead of a kind of shaded crossroads.

It occurred to me that the paved surface will certainly make the space easier to clean, and further allows city vehicles to drive around inside the square without ripping up the ground and grass. Except that these posts have been installed at every entrance and seem pretty solid. I’m not entirely sure what their purpose is… I think it’s to slow down cyclists.

Questionable Purpose

There’s a greater irony here: before the renovation Montreal police would regularly drive directly into the square and either park their cruiser near the statue or do a quick lap before heading back out. Tactics such as these are intended to intimidate and drive people away. It also destroyed the paths and and the grass. Municipal workers would do the same when they were ostensibly working at maintaining the square.

Now the square has a paved interior with wide paths and large curbs to ensure the division between green space and walking space, but these posts make it impossible for any car or truck to enter the square (and Montreal police pledged somewhat to treat homeless Aboriginals more like human beings).

One thing I noticed when visiting recently was the removal of shrubs, decorative fences and bus shelters that once ran around the square’s periphery. I completely approve of this, and wrote about the necessity of opening up sight lines in the past. The former arrangement of bus shelters and shrubs made it impossible to see across the space and for this reason made it an ideal location for homeless people to congregate (Place Emilie-Gamelin and Viger Square suffer from the same problem).

So that being the case, it makes me wonder if the homeless Aboriginal community (or any members of the broader homeless community for that matter) will return to the square.

The picnic tables have been removed, as have a number of park benches. Garbage and recycling has been moved to the periphery, largely at the entrances (in a move I could only assume was based on a recent STM decision to do the same with Métro stations, wherein garbage and recycling has been removed from platform level and relocated to receptacles located up near the ticket kiosks). This is one of those ideas that’s good in theory but rarely in practice (i.e. people have about a 30-second tolerance limit to carrying garbage; if a garbage bin isn’t immediately available, they tend to just drop it on the ground).

And as to those anti-skateboarding dimples on the curbs? Again, useful in theory, but given that the entire square has been paved over, the whole square is now far more inviting to skateboarders than it was previously. Moreover, on all sections of the curbs that ramp up from ground level, there doesn’t seem to be any dimples at all.

Put it another way, when I visited the square last week, it was a group of skateboarders who were making best use of the space. I don’t think this is what the city had in mind.

Underwhelming

Here we see an example of one of the myriad ‘activities’ slated to take place in the square. I think this was for a caricaturist. Elsewhere there was a small group of somewhat depressed looking ‘street performers’ dressed like pirate-clowns; I’m assuming this was entertainment intended for children…

Again, more good stuff in theory, but only time will tell whether this actually leads to a major vocational change for the square. There seemed to be a lot of people working (ostensibly) for the city that day, and supporting this over the long term may prove problematic what with austerity budgets.

Renovated Vespasienne

And here’s the renovated vespasienne. It looks great, but it didn’t look like the café component was fully operational. It’s unfortunate there’s no landscaping around the base of the edifice (no flowers or plants), as this gives the impression the vespasienne grew out of the pavement.

Perhaps the single biggest lost opportunity was the Métro entrance kiosk located at the northwest corner of the square, in that what is arguably the most problematic structure in the square was left as-is. The Métro entrance in the square was once very useful indeed – keep in mind Atwater was the western terminus of the Green Line for about a decade, and up until 20 years ago the Forum was the city’s primary sporting and concert venue. Thus, it was useful to have a large Métro entrance located directly across from the Forum to help manage the crowds. Ever since the Forum stopped being a important venue this Métro entrance hasn’t been particularly useful. It, and the long tunnel that connects it with the Alexis Nihon complex diagonally across the street, hasn’t been very well maintained and all too often stinks of piss.

And as such it will remain – I suppose getting the city’s parks department and the STM to cooperate on a city beautification project may have been a little too difficult to coordinate. Thus, the STM kiosk remains an oversized, underused and aesthetically disconnected element of the square. Had they removed it the square could have had an entrance from arguably its highest traffic corner. Instead, the structure remains as a lasting visual obstruction to what’s going on inside the square and will likely continue to serve as something of a homeless shelter in its own right.

At the end of the day it begs the question – is this really the best our city can do?

Rethinking Viger Square’s Rehabilitation

Light Blue represents the Gare Viger project, red the abandoned religious property, light green to areas for priority redevelopment, and yellow indicates smaller parcels of land that could be better used.
Light Blue represents the Gare Viger project, red the abandoned religious property, light green to areas for priority redevelopment, and yellow indicates smaller parcels of land that could be better used.

This is a bit late, but there’s a petition circulating I urge you to sign. We need to save Viger Square for demolition, as the city now intends to do.

In point form, here’s why:

1. Viger Square’s reputation isn’t reason enough to demolish it.

2. Demolishing the existing square doesn’t solve the homeless problem.

3. It doesn’t make any sense to spend $28 million to demolish the square and build a new public space when the existing square could be rehabilitated at a lower cost.

4. Rehabilitating the square is an opportunity to fully realize the original artistic vision of three prominent Quebec artists.

5. Doing so would likely eliminate all the factors that make Viger Square so generally undesirable to all but the homeless.

6. Improving sight-lines across the park by eliminating the outer walls of parts of the square, in addition to better general upkeep and better lighting is a subtler way of improving security and making the area more inviting. The original plan also called for permanent park fixtures, such as a café and public market.

7. Once the CHUM superhospital opens there will be a significant increase in the number of people living and working in the area, and the only reason why Viger Square became ‘homeless park’ in the first place was as a result of poor city planning resulting in local depopulation. In terms of serving as an important urban focal point, the new hospital will be as important as Gare Viger was a century ago.

8. To my knowledge, there’s an abandoned former convent up on René-Levesque which could be used as a large homeless shelter (it’s outlined in red in the photo above). Viger Square and Berri Square have the same problem – semi-permanent homeless populations that give both spaces poor reputations. Clearly what’s needed most is additional shelter space and social workers to help get these people off the streets, not an entirely new (but ultimately less interesting) public space.

For more information on what was originally intended, check out this video featuring the voice of UQAM architecture professor Marie-Dina Salvione:

Now, for those of you unfamiliar with Viger Square, it’s a bit of a local anomaly.

It’s underused public green space, a park many try to avoid in a city that generally values (and uses) its public spaces.

It’s also a radical re-thinking of landscape design, and the creative effort of three noted Quebec artists. That it has developed a poor reputation as a result of being associated with homelessness and drug use is not reason enough to destroy it: reputations can be rehabilitated.

The Coderre administration’s plan to spend $28 million to demolish Charles Daudelin’s Agora is shortsighted and unnecessary. Worse, it neglects the sad fact that the square was never completed to the original design.

Had it been, we likely wouldn’t be having this conversation.

Viger Square is a historic public green space; it’s been used as such since the mid-19th century, with its present boundaries taking shape in 1892. At the turn of the 20th century two major institutions took up positions on either side of the square – the École des hautes études commerciales on the Viger side (today a provincial archives building) and Place Viger (Canadian Pacific’s eastern Montreal passenger station and hotel, today a mixed-used residential, commercial and retail space) on the Saint Antoine side. At the time the area would have been bustling with activity, its immediate surroundings supporting a growing French Canadian middle and upper-middle class community.

Place Viger as it appeared in 1900
Place Viger as it appeared in 1900

The area’s high point occurred during the period 1898 (when the station/hotel opened) to 1935 (when the hotel closed) as Place Viger interacted closely with the park across the street, the hotel inviting guests to stroll ‘it’s vast gardens’. The train station would close in 1951 and the building was then sold to the City of Montreal to be used as office space. What destroyed the neighbourhood, so to speak, was the construction of the Ville Marie Expressway in the early 1970s. For whatever reason the decision was made to sacrifice the entirety of the park for the highway trench and then to build a new, modern, park atop the exposed trench.

This work was started in the late-1970s and completed in the mid-1980s. Modern Viger Square was designed as a public square in three distinct parts, set atop the highway to reclaim lost space. Have a look at Kate McDonnell’s photos of the site today.

Unfortunately, the citizens of Montreal never got the public space envisioned by Charles Daudelin, Claude Théberge and Peter Gnass.

The idea they came up with was to create an urban oasis, a place of refuge in the heart of the city. The original design included permanent fixtures, like a café and a small public market, as well as a comprehensive lighting scheme, and vegetation chosen to best interact with largely concrete structure.

None of this was ever implemented. The end result was perceived as cold and uninviting. Daudelin’s Mastodo fountain (in the western square) broke after a few months and never seems to have been repaired. Claude Théberges’ Forces fountain (in the central square) hasn’t been turned on in years. In the late 1980s the redesigned Viger Square began to attract a semi-permanent homeless population, one which exists to this day (the great irony being that the square would indeed serve as a refuge, albeit in an ‘out of sight, out of mind’ kind of way for the homeless).

For too many years Viger Square was the public space the city tried its best to forget about, but now that the CHUM superhospital is taking final form and the surrounding land values have increased there’s increased interest to invest in city beautification projects in this specific area. I suppose the city is trying to avoid the embarrassment of an opening-day ceremony taking place next to the city’s premier homeless camp…

Thus, the Coderre administration has come up with a plan to knock down Agora (the collection of raised concrete ‘boxes’) and radically transform the Daudelin and Théberge sections of Viger Square. Conceptual renderings of the proposed new space can be seen here.

This is a terrible idea.

For one the new design is completely uninspired. Whereas Daudelin, Théberge and Gnass came up with an original (though not fully realized) idea for an urban sanctuary, the proposed redesign is flat, banal and too open. Though the city intends to keep the Mastodo sculpture, it looks like it will be moved and decontextualized. As originally conceived, the Mastodo fountain arrangement was supposed to fill a channel with water, collecting in a pond adjacent to a ‘water wall’. In a similar vein, the Forces fountain was to demonstrate water ‘breaking’ through several granite pillars. It’s all quite avant-garde for landscape design, but because the city doesn’t want the homeless bathing in public fountains none of us get a chance to appreciate it as originally conceived.

And this is what brings us back to square one – bulldozing Viger Square and transforming it will make it a less desirable location for local homeless, but it does nothing to solve the homeless problem.

Montreal’s Central Business District in Evolution

The latest additions to Montreal's skyline taking shape - June 17th 2015
The latest additions to Montreal’s skyline taking shape – June 17th 2015
Overdale, we hardly knew ye...
Overdale, we hardly knew ye…
Lafontaine House, a still uncertain future...
Lafontaine House, a still uncertain future…
The new urban chasm
The new urban chasm
Tour des Canadiens de Montréal taking shape in background, with L'Avenue immediately in front of it and Rockabella in foreground at left
Tour des Canadiens de Montréal taking shape in background, with L’Avenue immediately in front of it and Rockabella in foreground at left
Icone Tower I with base of Rockabella II in foreground at right
Icone Tower I with base of Rockabella II in foreground at right
The west side of 1250 René Lévesque framed by new construction
The west side of 1250 René Lévesque framed by new construction

Panorama of new downtown towers - June 17 2015