Nothing succeeds like excess

The City of Montreal has announced plans to renovate the northernmost section of Dorchester Square at an estimated cost of $4.2 million. A $700,000 contract was awarded to noted local landscape architect Claude Cormier to prepare the design and tender specifications.

The section of Dorchester Square to be renovated runs between Peel and Metcalfe from the south entrance to the Dominion Square Building to the ‘camilienne‘ (also known as a vespasienne, it’s the small stone octagonal building with a café in it, identical to the similarly-purposed building in Carré Saint-Louis) and would include extending the green ‘footprint’ of the city square by reducing the number of lanes on the street that runs between the square and the building. Additionally, land around the entrance and exit to the underground parking lot would be reclaimed, somewhat, and pedestrian bridges are to be built over them.

As Andy Riga puts it in the Gazette “Under the current layout, pedestrians must contend with cars entering and leaving an underground parking garage adjacent to the square.”

Contend seems like an odd choice of words to me, as it gives the impression of a taxing struggle. We’re talking about cars slowly moving in to and out of a parking garage in a space that naturally attracts large numbers of pedestrians and has a posted speed limit of 10 km per hour. I no more have to ‘contend’ with the difficulties of navigating vehicular traffic here than any other intersection in the city, but I digress.

Perspective from Dominion Square Building looking 'Montreal South'
Perspective from Dominion Square Building looking ‘Montreal South’

What slays me is the bridges over the parking garage access ramps; talk about an over-engineered solution to a non-existent problem.

I can’t recall any serious incident involving a pedestrian struck by a car or a bus on either the side-street or the garage ramps, such that it requires physically segregating one from the other. That said, it might be neat to have a vantage point on the square from several feet above the ground.

But the cost… $4.2 million is a lot of money to be spending on parks beautification in an uncertain economy.

Don’t get me wrong, I like that the city is spending money on our parks and public spaces, I just wonder if we’re really going about this in the most efficient way possible. It seems that all too often the city waits for major renovations and redesigns when better year-to-year maintenance would make that unnecessary.

For your consideration: the Mordecai Richler Memorial Gazebo, Viger Square, Cabot Square up until about half a year ago…

The other thing to consider is that, as far as Dorchester Square/ Place du Canada is concerned, this would be the third phase of a project that stretches back about seven years and has so far cost $15.4 million. The third phase would increase the total to just under $20 million, assuming the new project’s current estimate is accurate.

It’s worth noting that the plan is to have the renovation completed by August of 2017, after one year of work.

I can imagine at least part of the $4.2 million project cost is related to this unusually rapid turn-around time. The first phase of Dorchester Square’s renovation, completed after about two years of work in 2010, cost $5.4 million and the southern section, Place du Canada, opened in November of last year after being worked on for about the same amount of time, at a cost of $10 million.

Consider that we’re spending $4.2 million to renovate a section of park roughly one-third the size of the space renovated six years ago at a cost of $5.4 million.

In other words, we’re spending a lot more per square meter to renovate a much smaller space.

So perhaps we need to reconsider the expensive novelties – like the pedestrian bridges and the half-fountain.

Bird's eye rendering of new Dorchester Square; note the pedestrian bridges
Bird’s eye rendering of new Dorchester Square; note the pedestrian bridges

Mo’ Métro blues…

Azur Métro train rendering

The first Azur Métro train is set to start rolling Sunday at 10:00 am on the Orange Line.

Huzzah!

The Quebec government awarded the contract to build 468 MPM-10 (Azur) Métro cars (forming 52 nine-car trains) to the Bombardier-Alstom consortium back in 2010 at a cost of $1.2 billion.

Deliveries were expected to begin in 2014, and one prototype was delivered to begin in-tunnel testing. This led to the discovery of unexpected complications, namely insufficient electrical power. Prior complications included the discovery a 200-meter section of the Orange Line was a touch smaller than the rest, requiring renovations to prevent the new Azurs from ‘grinding’ against the tunnel walls or ceiling.

In January of 2015 work on the project was suspended for six months in order for the consortium to work out problems with the trains’ automated switching software.

And now, one completed train has been delivered for entry into service. It is the first new Métro train in forty years and the third generation of trains to operate in the system. The Azurs will operate on the Orange and Blue lines, displacing the second-generation MR-73 trains onto the Green and Yellow lines. The MR-73s entered into service in 1976 and were refurbished in 2005-2008. The MR-63s currently operating on the Green and Yellow lines are fifty years old and the first trains to ever operate on the Métro.

According to a Bombardier spokesman, five more completed trains will begin operating soon and the company expects to have five or six more trains completed by the end of this year. All 52 trains are expected to be delivered by 2018, lest Bombardier-Alstom risk the wrath of the STM and Transport Quebec…

As to replacing the MR-73s, that’ll have to wait until the 2030s because, well, much like the MR-63s, they were rather well-built. There’s also no current plan to build the several hundred additional Azurs that would be required on top of the 468 currently on order.

On the same day the STM made their triumphant announcement, La Presse reported Transport Quebec discovered in mid-January the initial cost estimates concerning the extension of the Métro’s Blue Line by five stations to the east will now cost roughly twice as much ($2.9 billion).

Two years ago the AMT’s cost evaluation put the figure around $1.5 billion, but since then a Federal election occurred and the swarthy new prime minister has announced a major infrastructure spending spree. Mass transit projects aimed at reducing carbon emissions will almost assuredly get federal funds.

It should be noted that, as recently as a year ago, provincial transport minister Robert Poeti and Montreal Mayor Denis Coderre both seemed favourable to extending the Blue Line above-ground by using light-rail, though neither offered any particulars on how two different mass transit systems would be linked. Poeti indicated a Blue Line extension wasn’t even a priority, at the time. How things have changed! Coderre, who had previously argued Métro extensions were too expensive, is now very enthusiastic and argued it’s vital to the development of Montreal’s eastern sectors. He said this in the same breath as he mentioned several other transit dossiers which include a light rail system for the Champlain Bridge (and possibly other parts of the city) and a new West Island/Airport express train.

Of course none of this is particularly new: the plan to extend the Blue Line east goes back forty years at least. The map above dates back to when the City of Montreal was playing a more direct role in the development of the Métro, (my guess is 1976 given most of the Green Line stations are correct but the planning names of the western Orange Line stations are still listed. You’ll also notice the western extension of the Blue Line from Snowdon towards Ville Saint-Pierre, and that the eastern part of the Blue Line goes up towards Montréal-Nord), and as you can see back then bigger plans were in mind.

But herein lies the crux of the problem: Métro extensions are not planned by the City of Montreal or the STM, but pêle-mêle by a provincial government agency. Same story vis-à-vis the Azurs: the purchase was made by the provincial government for the STM.

It still boggles my mind that the future of high-speed mass-transit in Montreal will be decided by a provincial government agency, and apparently if and when the Fed decides to spend money on transit infrastructure. Montreal should be doing this on its own, and should further be setting its own development pace and priorities.

The question is whether expansion would be a priority for a local planning agency, especially when it comes to the Blue Line, currently the least used of Montreal’s four Métro lines. Connecting the Blue Line to the Mount Royal Tunnel, modifying the Green and Orange lines to accommodate a higher rate-of-service, or even re-designing the stations of the Blue and Yellow lines to accommodate nine-car Métro trains could all be seen as greater priorities if the ultimate aim was to increase ridership.

Ostensibly this is the underlying justification of the Blue Line expansion, but I have my doubts this is the best possible use of three billion dollars in new infrastructure spending. What I don’t doubt is the new figure likely has far more to do with the Fed’s newfound interest in urban mass transit than the actual costs of building a five-station Métro extension.

And on a closing note, don’t expect to see the Azurs operating on the Blue Line anytime too soon. A Bombardier spokesman told me the Azur train sets are only available in a nine-car configuration, though the stations on that line currently use MR-73s in a six-car configuration (again, owing to low use). The platform lengths of the Blue Line stations are the same length as all the other Métro stations, but also all have barriers on account of the shorter trains. The Bombardier spox indicated that the Azurs can’t be shortened and wouldn’t be operated on the Blue Line until the stations are modified.

So far, no indication the STM will go through with those renovations, nor is there any idea of how much that will cost.

Public consultation can’t replace vision

If it weren’t for the fact that it’s apparently a great excuse for a lot of infrastructure spending, would anyone really care about the 375th anniversary of the founding of Ville Marie, which will coincide with the 150th anniversary of Confederation in 2017? Are these dates important to us for any other reason than that politicians can use them as focal points?

There’s interest in renovating and redeveloping Montreal’s Old Port as part of this anniversary, and to that end the city has authorized renovation projects both for Place Vauquelin and Place Jacques Cartier. There was a public consultation at the Montreal Science Centre held on Thursday of last week that was apparently well-attended, and the intention is that a master plan will be completed by next year.

Note: the plan is only expected to be completed by 2017, there’s no word on any specific projects or what, if anything, might actually be improved/renovated by then. Moreover, it’s not entirely clear either what precisely needs to be done in the first place.

Dawn Quay - Montreal, Summer 2015

Also worth noting, though this CBC article seems to have missed the point, is that the Old Port does not actually belong to the City of Montreal, but to Canada Lands Corporation through the Old Port of Montreal Corporation. Ergo, while Montreal may be interested in developing the Old Port, the Fed is still ultimately responsible and they have no interest in ceding ownership of the land to the city. Mayor Coderre has argued that it’s vital for Montreal to take ownership of the Old Port in order to fully realize it’s revitalization.

As far as renovating the Old Port is concerned, the last time there was a significant investment was 24 years ago when Montreal was celebrating its 350th anniversary.

Since 2012 the operating agency has spent $14 million on new installations and activities, though the general manager of this same agency called the Old Port ‘tattered’ in a Montreal Gazette interview from a few days ago. An investment of $125 million back in the early 1990s gave the Old Port its modern form after the area spent much of the 1980s as a bit of a no-man’s land.

City from the Harbour - Summer 2015

Just to be clear on what we’re talking about, the Old Port is a very specific part of Montreal. It essentially consists of the long linear park running immediately south of Rue de la Commune, as well as Windmill Point and the four principle quays. Everything north of de la Commune is Old Montreal, and as things go in this city, despite the intimate relationship between these two sectors they administratively have nothing to do with one-another.

Why the Old Port needs to be ‘renovated, rejuvenated and revitalized’ doesn’t seem to be clear either. For the six million or so tourists who visit it every year, there doesn’t seem to be much complaining: it’s a park with various attractions next to the city’s premier tourist destination; what’s not to like? And either way last week’s public consultation wasn’t about what tourists want, it was about what we want.

Clock Tower Quay - Montreal, Summer 2015

I had registered to go and say something but then decided not to when I realized the crux of my argument – as a Montrealer – was that the last thing the Old Port needs more of is tourists or tourist-attractions. It seemed counter-intuitive to me as I can’t imagine this is what the operating agency wants to hear. They want to make money, point finale.

I’d argue strongly the investments made in the last few years – notably the beach you can’t swim at, the zip-line, haunted house and pirate-themed jungle gym – are all terrible and not worth the money spent on them. Moreover, I’m fairly certain these ‘attractions’ were only brought in after public consultations and/or market research indicated the Old Port was lacking in things to do. They all feel like the terrible ideas only a group of otherwise unemployable market research study participants can come up with.

Silo No. 5 - Montreal, Spring 2015

From a completely historical point of view, even calling it the Old Port seems misleading: the new attractions have absolutely nothing to do with the area’s history and the entire space has a decidedly modern feel to it. Jacques Cartier did not zip-line his way into Montreal in 1534, we’ve never had a serious pirate problem and, if we do have a haunted house in Montreal, my guess is that it’s probably one of the places where CIA-funded mind control experiments were conducted, and not an assembly of brightly coloured former shipping containers.

If the Old Port has a serious problem, it’s that it’s trying way too hard to be all things to all people, again, another problem stemming from public consultations.

I’m generally indifferent to all the Old Port’s crap because I know I’ll never be involved with it. I’m never going to buy any of the overpriced tchotchkes, knock-off handbags or t-shirts that say ‘Federal Breast Inspector’ on them from the spaced-out teenagers sitting in the nifty new container kiosks. Nor will I ever dine in the Old Port, given the food is overpriced and of low quality; this is a gourmand’s city, something which is not reflected in the Old Port or much of Old Montreal for that matter. I think I’ve been in the Old Port well over a hundred times in the last decade and I don’t think I’ve spent more than $20 in that entire time.

Attractions, Old & New - Montreal, Summer 2015

I also don’t think I’m alone. As far as I can tell, most Montrealers in the know know better than to waste their money in our city’s various tourist traps. And the Old Port is the biggest tourist trap we have.

Now all that said, I still thoroughly enjoy going to the Old Port, and will continue to do so regardless of whatever the city or Canada Lands Corporation comes up with. It’s a big space, there’s only so much damage they can do. The best parts of the Old Port, at least in my opinion, are either technically off limits or otherwise far from its central and most touristy part. There’s a look-out at the end of Alexandra Quay that offers amazing views of the city an the river, not to mention the grounds around Silo No. 5, which actually look like there was once a park located there that’s been since closed off to the public.

Abandoned Park - Montreal, Spring 2015

Assuming the majority of Montrealers do indeed agree the Old Port is ‘in tatters’ then why not just do the simple thing and fix it up? Fresh paint, new uni-stone, update the landscaping, improve the lighting. Whenever I go to the Old Port, this is typically what I notice first and foremost.

I feel there’s a prevalent belief in this city that we need to reinvent the wheel all the time, and that we won’t be truly happy with our city until it’s completely unrecognizable but teaming with tourists.

Obviously this isn’t what we want. If the powers that be want to best represent the interests of the citizenry, perhaps they should consider how Montrealers typically use the most successful of our public spaces (on top of what makes them so successful in the first place). Consider: the tam-tams are completely spontaneous and the city isn’t involved one iota. Most of Mount Royal Park is attraction-less and most Montrealers seem to be able to enjoy the mountain without having to spend much money. The lookouts are free, the trails are free, lying in the sun is free (etc.)

Windmill Point - Spring 2015

Rather than occupying public space in the Old Port with activities and attractions, why not just leave it open and accessible and let people figure it out for themselves?

On a closing note, I really hope they don’t do anything with Silo No. 5 – it’s a monument in its own right, and fascinating to explore. My main concern at this point is that CLC through the Old Port of Montreal Corporation will either try to redevelop the site into condos or some kind of half-assed attraction (like that virtual-reality thingamajig that was up and running for a few years on Sainte Catherine Street near McGill College… I think it’s a watch store or a Five Guys now).

Second closing point: though it’s outside the realm of the Old Port, I’d argue the single best thing the city could possibly do is to convert Bonsecours Market back into a public market (à la Atwater or Maisonneuve markets) and – by extension – use the market as a transiting point between Old Montreal and the Old Port. I think this would entail ‘opening up’ the Rue de la Commune side of the Bonsecours, such as with vendor stalls and additional doorways (etc.), but the point is if we want these tourist-driven parts of the city to still be attractive to locals, we need to offer a little more of what makes Montreal such an exquisite city in the first place. I’m sure the 3,000 or so citizens who live in the area would certainly appreciate access to a proper market, and the tourists would have better dining options (at least) as a result.