Category Archives: Let’s make this an election issue

Montréal Métro Extensions – How to get around an impasse.

2009 AMT proposal for Métro extensions - not the work of the author

There’s been a fair bit of talk about extending the Montréal Métro of late in the English Press. Typical; now removed from the halls of power the English media spends its time twiddling their thumbs and dreaming about what could be, while Angryphones come out of the woodwork to demand Métro access to the West Island. I’ve said it before and I’ll say a million more times – no West Island residents should expect Métro extensions until there’s a West Island city, one with a tax-base as large as the cities of Laval or Longueuil. That or the West Island communities seek voluntary annexation from the City of Montréal. Then, and only then would the citizens out there be in a position to demand Métro access. I personally think a Highway 40 corridor Métro line from De la Savanne station to Fairview (and possibly as far as Ste-Anne-de-Bellevue) would be an excellent way to cut back significantly on vehicular traffic on our major highways. However, such a new line should be mirrored on the eastern side of the island, such as with the recommended Blue Line extension to Anjou. That said, residential development on the eastern side is oriented on a more North-South axis than on the West Island, and thus the proposed Pie-IX line (running from Laval or Montréal-North south to the Centre-Sud/HoMa district) would likely handle more passengers than any West Island extension (but only if it in turn were connected to East-West lines at multiple points).

While an unfortunate number of people have complained the 2009 MTQ proposal (above) is ‘too focused on the East End’, I look at it as focused primarily on where the population density seems to be high and increasing. There are more than 400,000 people living in Laval and another 700,000 people living on the South Shore (spread out over several municipalities, with an estimated 230,000 people living in Longueuil alone). Moreover, there are 85,000 people living in Saint-Laurent borough and another 125,000 people living in the Ahuntsic-Cartierville borough. In total, the proposed extensions as demonstrated above could potentially serve almost 1 million people directly and indirectly.

So while it is nice to dream about ideal systems that serve the entire metropolitan region, or at least serve the City better, we need to consider what the government is proposing seriously.

What’s unfortunate is that this plan now seems to be in jeopardy, given that the respective mayors of Longueuil, Laval and Montréal had to take out full page advertisements in the local press some months ago announcing why their city should benefit from expansion. I’ve said it before – sicking the mayors against each other isn’t going to achieve much. The entire system needs to be expanded until the whole region is eventually covered. In essence, we need to follow the same planning philosophy used to design the Paris, New York, London or Moscow subway systems, wherein the project is considered incomplete until near-total coverage is achieved. We won’t grow nearly as quickly unless the Métro develops in such a fashion so as to increase transit efficiency within the region. Montréal’s successful urban communities wouldn’t be nearly as successful as they are if it weren’t for the fact that they have Métro access. It is crucial for expansion and development.

In sum, we need to start planning as a unified metropolitan region wherein the interests of all citizens are considered simultaneously. Métro line development cannot be a reward for political loyalty. We’ve come a long way from the nepotism of the dark ages under Maurice Duplessis, so when the provincial government finks out and pits the suburbs of Montréal against the City for an individual line extension, the citizens of all communities must demand an end to such ridiculous partisanship. We can’t continue on like this. This is why our city is broken.

And just a reminder – completing the project illustrated above is pegged at 4 billion dollars. Cost of the new Champlain Bridge has been estimated at 5 billion dollars. Is it me or would it not be smarter to use that money to complete the proposed Métro expansion, and then spend a billion dollars renovating and improving the existing Champlain Bridge? A new Champlain Bridge will accommodate about 156,000 vehicle crossings per day. With this expansion, the Métro would be able to accommodate over 1.5 million passengers per day, which in turn will free up space on the highways, bridges, tunnels, buses and commuter trains, possibly even allowing some buses to be re-purposed to new routes, further improving the public transit system here in Montréal. To me it’s a no-brainer. What do you think?

What were they thinking? {No.1}

Site of a former tram-tunnel, now open-air, on the Camillien Houde Parkway

(Part of an unfortunately on-going series)

The Camillien Houde Parkway has got to be one of the stupidest ideas ever conceived of in the history of Montréal, which is unfortunate given that its a beautiful and exciting parkway. Make no mistake – I love this street, I especially love all the great memories I’ve attached to it, such as taking it to go visit my newborn brother when I was three. Unfortunately, it came at too-high a cost, and any individual in this city who is concerned about the future of our most iconic landmark should see the Camillien Houde Parkway as public enemy number 1.

Here’s why:

a) It’s named after former Mayor Camillien Houde, well-remembered for his charisma, anti-conscription related internment during WW2, the Kondiaronk Belvedere and the many Vespasiennes (adoringly called Camilliennes for decades) he had constructed as make-work projects during the Depression. He also vehemently opposed the construction of any street or boulevard bisecting Mount Royal. At the very least could we consider changing the name?

b) As you can see from the map embedded here (use bird’s eye view for best results), the parkway cuts-off access to a small, but significant, portion of Mount-Royal Park. I say significant because the ‘dead-zone’ would allow better access to the undeveloped portions of Notre-Dame-des-Neiges Cemetery and the parkland owned by the Université de Montréal. Thus, any discussion of a Mount Royal pedestrian and cycling ring-road would have to consider whether such a path and the parkway could actually coexist. Chris Erb of Spacing Montréal discusses the proposal for a new park on the Outremont Summit, an idea which was floated around in the Fall of 2009 and, I believe, is still very much up in the air. If anything, Mount Royal’s protected status is more tenuous than ever with the announcement of a new fenced-off condo development at the site of the former Marianopolis College, and the still as-yet unfinished saga concerning the redevelopment of the former Outremont convent. That being said, if there’s an earnest will from the populace to increase the total protected space of the mountain-park, then the parkway will have to be the first to go, since it acts more as a boundary then bisecting scenic drive.

c) As a result of the parkway, there are several large parking lots on the mountain – land that had once been raw natural forest. Given that the mountain has, traditionally, been frequented overwhelmingly by locals, and not tourists, the necessity of so many parking lots near the summits can be called into question. Especially because, once upon a time, a tram ran the length of the parkway. Reclaiming the parking spaces could be done by investing in a new tram, one which would ideally run from the bottom of Guy (placing a terminus at the corner of William in Griffintown) up to Cote-des-Neiges, dropping people off at a mountain terminus near the pavilion at Lac aux Castors (you’ll notice, a loop already exists here). This could effectively allow the rest of the parkway and the parking lost to be reclaimed as parkland.

d) The photo above demonstrates another problem – there used to be a tunnel at that exact spot. The tunnel allowed people to get from the Mount-Royal side to the Outremont side over-top, not to mention offering considerably more room for the variety of animal species native to the mountain park. Even if the parkway remains, at the very least, a new tunnel ought to be built here, to allow for the maximum level of freedom of movement.

Horse-drawn carriages at the Mount Royal Chalet, 1960s - not the work of the author.

It’s been a while since I’ve been to the summit, though I think I was up there earlier this Summer. The improvements to the Peel Staircase and the access to the Olmstead Trail are excellent additions, welcoming urbanites with elegant and naturalistic entrances that fit into the idea of the sacred, leafy refuge. I remember the last time I was up there a temporary fence had been put up to divide the belvedere into two parts, though no work was being done at the time.

Still, as the city grows and the last remaining scraps of undeveloped land in the CBD is gobbled up as it will be over the next couple of decades, protecting our green spaces is going to become an even greater priority.

We should remind ourselves that, while Mount-Royal Park is indeed exceptionally large and, in essence, our own little playground, it serves a very large geographic area and further supports an inordinately large population. This is a major issue for any urban citizens of Montréal, as the city and real-estate developers frequently point out our major parks when attempting to justify the destruction of smaller green-spaces. Such as it was with regards to Parc Oxygene, a small green-space developed by community members on a piece of otherwise unusable land. The apparent ‘owner’ of the plot has told residents they can just as easily go to Mount Royal Park, Fletcher’s Field or Parc Jeanne Mance, all of which are about a block away. However, much like theatres, concert halls and bars, parks have a capacity, and overloading our parks will inevitably lead to their ruin.

Don’t believe me? Consider the 1976 St-Jean-Baptiste Day celebrations, which saw tens of thousands of people descend on Mount-Royal. The damage to the park and pollution from one day’s worth of festivities was more traumatic and required a more extensive clean-up than did the Ice Storm of 1998!