Category Archives: Kondiaronk РMy Montr̩al Experience

On the Métro Impasse

2009 AMT proposal for Métro extensions - not the work of the author

There’s been a fair bit of talk about extending the Montréal Métro of late in the English Press. Typical; now removed from the halls of power the English media spends its time twiddling their thumbs and dreaming about what could be, while Angryphones come out of the woodwork to demand Métro access to the West Island. I’ve said it before and I’ll say a million more times – no West Island residents should expect Métro extensions until there’s a West Island city, one with a tax-base as large as the cities of Laval or Longueuil. That or the West Island communities seek voluntary annexation from the City of Montréal. Then, and only then would the citizens out there be in a position to demand Métro access. I personally think a Highway 40 corridor Métro line from De la Savanne station to Fairview (and possibly as far as Ste-Anne-de-Bellevue) would be an excellent way to cut back significantly on vehicular traffic on our major highways. However, such a new line should be mirrored on the eastern side of the island, such as with the recommended Blue Line extension to Anjou. That said, residential development on the eastern side is oriented on a more North-South axis than on the West Island, and thus the proposed Pie-IX line (running from Laval or Montréal-North south to the Centre-Sud/HoMa district) would likely handle more passengers than any West Island extension (but only if it in turn were connected to East-West lines at multiple points).

While an unfortunate number of people have complained the 2009 MTQ proposal (above) is ‘too focused on the East End’, I look at it as focused primarily on where the population density seems to be high and increasing. There are more than 400,000 people living in Laval and another 700,000 people living on the South Shore (spread out over several municipalities, with an estimated 230,000 people living in Longueuil alone). Moreover, there are 85,000 people living in Saint-Laurent borough and another 125,000 people living in the Ahuntsic-Cartierville borough. In total, the proposed extensions as demonstrated above could potentially serve almost 1 million people directly and indirectly.

So while it is nice to dream about ideal systems that serve the entire metropolitan region, or at least serve the City better, we need to consider what the government is proposing seriously.

What’s unfortunate is that this plan now seems to be in jeopardy, given that the respective mayors of Longueuil, Laval and Montréal had to take out full page advertisements in the local press some months ago announcing why their city should benefit from expansion. I’ve said it before – sicking the mayors against each other isn’t going to achieve much. The entire system needs to be expanded until the whole region is eventually covered. In essence, we need to follow the same planning philosophy used to design the Paris, New York, London or Moscow subway systems, wherein the project is considered incomplete until near-total coverage is achieved. We won’t grow nearly as quickly unless the Métro develops in such a fashion so as to increase transit efficiency within the region. Montréal’s successful urban communities wouldn’t be nearly as successful as they are if it weren’t for the fact that they have Métro access. It is crucial for expansion and development.

In sum, we need to start planning as a unified metropolitan region wherein the interests of all citizens are considered simultaneously. Métro line development cannot be a reward for political loyalty. We’ve come a long way from the nepotism of the dark ages under Maurice Duplessis, so when the provincial government finks out and pits the suburbs of Montréal against the City for an individual line extension, the citizens of all communities must demand an end to such ridiculous partisanship. We can’t continue on like this. This is why our city is broken.

And just a reminder – completing the project illustrated above is pegged at 4 billion dollars. Cost of the new Champlain Bridge has been estimated at 5 billion dollars. Is it me or would it not be smarter to use that money to complete the proposed Métro expansion, and then spend a billion dollars renovating and improving the existing Champlain Bridge? A new Champlain Bridge will accommodate about 156,000 vehicle crossings per day. With this expansion, the Métro would be able to accommodate over 1.5 million passengers per day, which in turn will free up space on the highways, bridges, tunnels, buses and commuter trains, possibly even allowing some buses to be re-purposed to new routes, further improving the public transit system here in Montréal. To me it’s a no-brainer. What do you think?

So apparently we’re getting a very expensive bridge…

The Champlain Bridge, Montréal - not the work of the author.

…and as always, efficiency takes a back seat when it comes to stimulus spending and infrastructure development in the Montréal region.

The CBC announced a plan by the Conservative government of Stephen Harper (in case you were unaware) to build a $5 billion replacement for the Champlain Bridge over the course of a decade. The new bridge will feature ten traffic lanes and is designed to fully replace the existing Champlain Bridge, which is estimated by some to no longer be worth retrofitting or renovating after 2022 when it will turn sixty years old. Maintenance costs to keep the bridge operational until then will come up to about $25 million over the next ten years. Previous cost estimates for bridge replacement came to $1.3 billion for a replacement by a similar span, and $1.9 billion for a double-decker tunnel capable of handling a similar amount of traffic (roughly 156,000 cars and trucks use the bridge each day) on one level with buses and trains on a lower level. The projected construction time was five years for each project, which is in line with the amount of time it took to build just about every other bridge and tunnel connecting the Island to the Mainland. Moreover, adjusted for inflation alone, the cost of building the Champlain Bridge would only cost about a quarter billion of today’s dollars. Now while many argue the cost of construction has gone up, I’d still like to know just what it is about this replacement bridge that justifies a $5 billion expenditure? For additional details, see the Wikipedia entry.

Perhaps the cost was estimated based not on actual costs for materials, labour, design and construction, but instead based instead on trying to ensure everyone gets a slice of the stimuli pie. Given that Québec lost out on the Great Canadian Shipbuilding Sweepstakes, perhaps this expensive bridge project is some kind of a consolation prize. Do we not recognize that it is sounder to seek smaller amounts of tax revenue for stimulus spending than larger amounts? Is it not our responsibility to seek efficient infrastructure solutions?

Here’s the deal – in my opinion, replacing the Champlain Bridge with an enlarged replacement toll-bridge isn’t exactly helping reduce traffic congestion in Montréal, and its not entirely fair to use tax dollars to build it and then a toll to pay for it. Moreover, it may not even be necessary, and that is to say that there are many considerably wiser, more efficient ways to spend such a large sum (such as on public transit) which in turn may allow the Champlain Bridge a longer life-expectancy and a considerably smaller associated long-term maintenance costs, thus making bridge replacement a moot point.

But none of that seems to matter – once again, infrastructure redevelopment is narrowly focused, places an emphasis on the needs of the few as opposed to the many, and is more about securing large investments for an already corrupt construction industry instead of seeking to trim costs and ensure fiscal responsibility. Is it any wonder the rest of Canada thinks we get an unfair advantage?

Consider the 2009 Métro extension plan, which aimed to increase the network by a dozen stations on twenty kilometres of new track and tunnel, extending into Eastern Montreal and the South Shore in addition to closing the Orange Line loop, benefitting the residents of St-Laurent, Pierrefonds, Cartierville and Laval. That project is estimated to cost $4 billion and could potentially add several hundred thousand more individual uses per day in addition to further extending the operational reach of both the STM and AMT. Aside from the issue that the provincial plan benefits people throughout the metropolitan region, it further would lessen the strain on our bridges, meaning the Champlain’s life-expectancy (with additional preventative maintenance) could be extended beyond sixty years. All of the other bridges are considerably older than the Champlain and are still working fine, and it should be noted that other bridges and tunnels were often designed as part of larger transit schemes. This replacement bridge will carry no tram lines, no provision for commuter trains, and only a limited number of reserved bus lanes. It’s too little, too late, and designed for a bygone era. How typically Québecois.

Unfortunately, it now seems as though the STM is unable to secure funding to execute the entire plan, and so the Mayors of Montréal, Laval and Longueuil now have to petition the people and the provincial government for their own individual extensions. This is an awful situation to be in, yet here we are, bitching and banging heads against each other for a thin slice of the better idea. If the fed can justify spending $5 billion on a bridge replacement, why not spend $4 billion to help more people get around and then spend the billion left-over dollars to fully renovate and upgrade the existing bridge? How is that a sounder investment?

Consider other plans, such as the use of ferries, light-rail lines across the ice-bridges, new Métro and commuter train lines or running surface trams on reserved lanes on the existing bridges and tunnels. There are many ways to cut down on the number of people bringing their cars into the city and increase the number of people utilizing public transit as their primary means to get around. But if the City can’t reign in government and guarantee an efficient use of stimulus funding, then we’re bound to develop along someone else’s politics, someone else’s vision. And as long as we congratulate ourselves for taking unfairly large portions of the communal tax revenue (as some kind of sick justification for our opportunistic federalism, no doubt), then we get what we pay for, and have no reason to pout when things fall apart. We’ve been responsible for our own infrastructure problems for years because we develop said infrastructure as though it were a consumer item, and thus the bridges, tunnels and buildings we procure are designed to artificially stimulate the construction industry by requiring near constant maintenance. And so we are literally stuck in a rut. Why is it that every Summer major construction work is required throughout the City? Are we foolish designers or are we trying to keep a bloated industry well-financed with futile self-perpetuating renovation work? We must begin designing more durably and begin employing innovative technological solutions to finally solve our frequent problems with rapid infrastructure degeneration.

It’s becoming clear to me that we are not designing with problem-solving in mind, and this will be our undoing. Technological solutions for most of the infrastructure problems we encounter on a day to day basis could be saving us incredible amounts of money, but they mean some people in the construction industry won’t make as much money as they used to. The new Champlain Bridge project smells so bad of graft and nepotism you’d think the price tag was of the scratch-and-sniff variety.

The Future of the Olympic Stadium

What if this was the view from a condo tower? Would that sell?

There were public consultations held last weekend to discuss what ought to be done with the Olympic Stadium. Unfortunately I was both occupying Montréal and otherwise unaware the guided tours of the building that were part of the consultations, and so was unable to go myself. Regardless, if you’d like to participate in the online discussion and complete a survey, click here.

So what are we to do with our beloved and excessively expensive Big O?

I, for one, do not and have never supported any plans to demolish it, despite the popularity of such a flippant suggestion.

First of all, it’s paid for. If it had a regular tenant, such as a professional sports team that could guarantee high attendance, the costs of maintenance moving forward will pale in comparison to the revenue generated through use of the stadium. Use begets more use, and a return to the days when the Big O was also a prime location for rock concerts, conventions and congresses will come naturally as long as there is a primary draw. General usage was considerably higher when the Expos were popular and drawing large crowds. Moreover, we know with certainty that major league sports and concert venues can have a positive local influence and stimulate further economic growth in the area immediately surrounding the site. The area around the Montreal Forum has yet to recover from the loss of stimuli that went with the move to the Bell Centre, as has the area around the Big O. By contrast, the area around the Bell Centre is starting to show signs of improvement and may very well (for better or for worse) become a focal point for new development in the Central Business District (CBD).

Second; there’s nothing wrong with the facilities, the buildings or the infrastructure – it’s what’s around the Olympic Park which is partially the problem. Consider this: the City of Montréal has been concentrating recreational and leisure activities along Sherbrooke East between Pie-IX and Viau since the creation of the Montréal Botanical Gardens in the 1930s. Now, add to that impressive attraction the Olympic Stadium and Tower, the Insectarium, Biodome, Maurice Richard Arena, the new Planetarium, Saputo Stadium, Chateau Dufresne, the Olympic Pool, a municipal golf course, the Olympic Village, Maisonneuve Park and a multiplex cinema to boot. Just adjacent to the area bounded by Assomption, Pie-IX, Rosemont and Hochelaga Blvds is the Maisonneuve-Rosemont hospital complex and CEGEPs Rosemont and Maisonneuve. This area is further served by three stations on the Green Line of the Métro. Ergo, when asked what I would do to help secure a bright and prosperous future for the Olympic Stadium I would say ‘consider what hasn’t been centralized here’ – it’s what’s missing that is the key.

I think the answer is principally transit and residential accommodation. With so much to offer there are scarcely any hotels in the area, no high-rise apartments taking advantage of the breath-taking views, no condominiums taking advantage of the latter in addition to the supremely well-connected location, and no commercial office space. Instead of banging our heads against the wall wondering why we didn’t bring the stadiums closer to the city, why not bring more of the city out to the stadium? With so much concentrated at this point, why isn’t the entirety of the Olympic Complex not viewed as the Eastern Gateway to the City of Montreal and ‘regional service centre’ for the Eastern core of Montréal? The space from Papineau to Assomption could stand to use increased densification along principle arteries, such as St-Joseph, Rachel, Ontario, Hochelaga, Pierre-de-Coubertin and Sherbrooke. A combination of new medium-income apartment towers and high-income condo towers lining these streets will help establish a visual link with the denser core of the urban centre and require a re-evaluation of land use in the sector bound by Dickson and Pie-IX extending South from Rosemont Boulevard to the river. By increasing population density the demand for additional community cultural and social services grows proportionally, and thus new schools, libraries, CLSCs etc will have to be built, likely occupying space otherwise zoned for light industrial activity.

This sector is lousy with old industrial spaces which no longer provide the societal anchor they once did. The industry can be consolidated in more opportune locations and the space better utilized to support a significant increase in the local population. Moreover, increasing the population while simultaneously diversifying social and cultural groups in the same area will help ‘even-out’ the neighbourhood, and provide numerous additional possibilities for small businesses and local services. So while old warehouses are turned into condo towers and elementary schools, additional social and civic services can be concentrated at the Olympic Site – there’s a lot of open space here, I can imagine space for a CLSC or library or a really kick-ass kindergarten can be worked into its master plan. The point is, build up the population significantly, and then focus that population’s attention on the Big O as a kind of meta civic centre.

To see a bird’s eye perspective of the Olympic Park and environs, click here.

Increasing population density isn’t enough by itself – types of residential housing must remain diverse and new opportunities for small businesses must be created. But on top of that, some key alterations to the urban tapestry will become necessary, specifically with regards to the quadrilaterals bounded by Pierre-de-Coubertin, Bennett, Ontario and Latourneaux in addition to the one bounded by Sherbrooke, Dickson, Hochelaga and Viau. Both of these areas are principally industrial. The former could be re-designed so as to allow for a new public plaza running between the Stadium and the Maisonneuve Market with large capacity residential and commercial buildings built along its edge. I would recommend a similar plan for the latter as well – after all, what’s centralization if it isn’t apparent to anyone that there’s a centre to speak of?

Aside from a generally massive increase to population density in this sector and (by extension) an effort to better equip this sector with necessary social services, improvements to transit would further allow the area to become a more self-sustaining tourism destination. Large underground parking garages need to be built around the site to support increased tourism from within the metropolitan area, and by extension, a new Réso expansion designed to link key facilities with new residential and commercial developments in the area could also do much to help draw residents to a new community centre focused on the Olympic Park site. In other words, if it was once the dream of Mayor Drapeau to encourage urban development towards the East, we need to ask ourselves what would make the Olympic Park area seem to be part of a larger urban whole. Consider the two plans for Métro extensions in this article – both involve the placement of a new multi-line station under the Olympic Stadium (the plan to have a Pie-IX metro line has been quite popular over the years, and there’s a definite need to improve Métro access East of the CBD).

In any event, I think I covered all the bases – securing a proud and profitable future for the Big O is almost thoroughly dependent on a City plan to completely overhaul the HLM sector and instigate a kind of gentrification that would encourage a new socio-economic diversity in the area, provide better services for families and further turn it into an outward-facing urban focal point.

But if you want to get more people out there on the cheap, perhaps the short-term, inexpensive solution is simply to re-build Corridart in a new form, linking the CBD with the Olympic Park by means of an outdoor art-gallery erected along Sherbrooke Street.

Suffice it to say, this is more than just a potential election issue – the citizens must make their voices heard.

Scenes from a Saturday Morning in Old Griffintown & Little Dublin

Tour de la Bourse and Delta Downtown from Chaboillez Square

If you like what’s above, click here for more photos from a neighbourhood in transition. Or you can select the seventh series in the photographs tab above.

Enjoy!

Scenes from Occupy Montr̩al РPhotographs VI

Occupy Montréal, October 15th 2011

To see a series of photographs from yesterday’s Occupy Montréal demonstration, click here, or click on the photographs tab above and go down to collection VI.

I’ll write up my thoughts on the day later on. Still decompressing from an adventure filled Saturday. Gotta say the SPVM was really acting cool and professional yesterday. Frankly it was impressive and unexpected. I saw a police commander and a little kid making goonie faces at each other. It was hilarious and heart warming. It was a really good demonstration of solidarity, and one of the best protests I’ve ever been fortunate enough to participate in.

More later.

Concrete Blocks (may) Fall Off Building!

The scene around quarter to six in the evening.

I’m going to get a picture!

* Update *

I got a picture!

** Update II **

A security guard yelled at me for taking pictures!

*** Update III ***

The photograph seen previously was in fact the bullet-riddled carcass of a building in Bosnia taken during the Balkan Wars of the 1990s. The similarities to what we’re dealing with here in Montréal are…
none whatsoever.

But depending on who you talk to, you may have the impression Montr̩al is in the midst of a massive crisis with regards to crumbling infrastructure. In some respects I think we may very well be Рat least it seems that way in the media:

From the Gazette.

From Spacing Montreal.

From the Toronto Star.

Here’s the basics regarding today’s street closure.

If you followed this story* throughout the day you may have noticed slight discrepancies between the lead and the actual situation. Nothing feel off the ten-floor building at Cathcart and University, a window-washer noticed some of the slabs were loose. That’s pretty much it.

Now, that said no one’s quite sure when the last time the building was inspected, and it got me wondering whether the City needs to go on an all-out inspection blitz, literally inspecting every single building, street, bridge, viaduct and tunnel larger than a bus shelter in the entire metropolitan region. One shot, it would probably take an entire year to complete with a massive team of ‘deputized’ building inspectors. I can imagine a six-week intensive training course and a source of part-time employment for every university student in the city. The following year would be spent analyzing the data and getting those responsible to make the necessary repairs.

Honestly, how else are we going to get our confidence back? Such a study may just be the ticket to, at the very least, have a thorough understanding of the shape we’re in. I would hazard to guess such a report would indicate the majority of structures are sound and in no danger of having pieces fall off, but that said, a thorough city-wide inspection of everything would doubtless net a long list of repairs. It would be a massive wake-up call and may be enough to get the citizens to realize more is needed to keep our infrastructure safe and secure.

What do you think?

Is the media over-doing it? Is this to be expected in any urban environment? Or does the City of Montreal need to take dramatic action to counter years of inaction, as some suggest?

Let me know…