All posts by Taylor C. Noakes

Montreal to end generations of low self-esteem in women with new Barbie Museum

The new Chador Barbie is a big hit in countries where women  can be stoned for witchcraft
The new Chador Barbie is a big hit in countries where women can be stoned for witchcraft

The Disneyfication of Montreal continues unabated.

New for February of 2016, the world’s largest permanent exhibition of Barbie dolls is set to welcome tens, possibly dozens of people when it opens next week somewhere in the shopping mall that was once a luxurious hotel.

Five-thousand square feet of Les Cours Mont-Royal will be dedicated to a collection of 1,000 Barbie dolls, most of which will be exhibiting haute-couture from some of the world’s leading fashion houses.

According to the recent Simone de Beauvoir Institute graduate I interviewed panhandling outside Peel Métro, “…that’s the saddest thing I’ve ever heard.”

The museum (and my aren’t we throwing that word around a lot these days) will have free admission, as organizers felt it would be inappropriate to charge North American children to see what more productive Chinese children spend their days ‘creating’.

In lieu of admission fees, Barbie Expo® will be asking the visitor(s) to donate to the Make-a-Wish Foundation, though apparently will not be able to grant wishes such as: ‘I wish my kid’s doll was a better role-model’, ‘I wish Barbie’s proportions were physically possible’ or ‘I wish my schmuck kid stops begging me to come here.’

Les Cours Mont-Royal has followed the precedent set by the Montreal Eaton’s Centre in turning spaces left vacant due to exceptionally high rents into ‘museums’ designed to inspire young minds. Their Grévin Wax Museum features life-size replicas of the heroes of New France, as well as noted children’s enthusiast Michael Jackson and the lesbian chansonnier Justin Bieber.

The new museum will be promoted by the Quebec and Montreal tourism offices as representative of Montreal’s dynamic and well-respected cultural scene. Barbies will not only be featured in designer clothing, but also in unique dioramas, such as ‘Barbie at Waterloo’, ‘Barbie exiting the Apollo lunar module’ and ‘Babushka Barbie in Dealy Plaza, Nov. 22nd 1963.’

Though he could not be reached for comment due to an official policy of ignoring local journalists, Mayor Denis Coderre was imagined stating “Montreal’s back motherfuckers!” when asked what, if anything, the Barbie Museum will contribute to the city’s cultural vitality.

The odd saga of the Montreal Museum of Fine Art’s entrance

Desmarais Pavilion of the MMFA , Moshe Safdie (architect). Ground broken in 1989, project completed in 1991.
Desmarais Pavilion of the MMFA , Moshe Safdie (architect). Ground broken in 1989, project completed in 1991.

A few years ago I was at O’Hare with an hour and a half to kill between flights and after a quick bite and a coffee I was keen to go have a smoke. Unsure of where the exit was located, I approached two TSA agents and asked “how do I get outside?”

Annoyed, one replied “you go out through the front door.”

Indeed.

Whether notoriously complex to navigate Mid-West international airports or a stately fine arts museum, every good building needs a well-designed, fairly obvious, and effectively welcoming entrance.

Though this may seem obvious, consider there’s been considerable controversy concerning how Montrealers accessed their fine arts museum. The issue of access has led to a major renovation of the Montreal Museum of Fine Arts’ Hornstein Pavilion (the neoclassical structure on the north side of Sherbrooke Street), as well as the subsequent ‘permanent closure’ of that building’s massive wooden doors for nearly a decade. And when the museum sought a major expansion in the 1980s, what was ultimately completed was focused on yet another entrance.

I say this because I remarked last weekend that the MMFA’s entrance on the south side of Sherbrooke has been closed for renovations and that patrons were instead to enter through the portico, passing the immense marble columns and oak doors just as Montrealers had done a century ago when the Hornstein Pavilion was a brand new addition to Sherbrooke Street, the crown jewel of the Square Mile.

The front doors of the main pavilion were closed in 1973 when the museum undertook a three-year renovation. They’d remain closed after the MMFA re-opened on the 8th of May 1976 because it was thought the neoclassical styled entrance was elitist and ‘undemocratic’. This wasn’t a uniquely Montreal phenomenon either; several other major North American arts museums were closing the old doors and building new entrances to better connect with the public.

In the case of the MMFA, this move was likely a consequence of the MMFA’s historic attachment to Montreal’s Anglophone elites and the changing political climate of the day (it also happened that the MMFA was an entirely private endeavour up until 1972, at which point it began receiving funding from the provincial government, which in turn helped secure the expansion plan).

To coincide with the opening of the new pavilion built further up Avenue du Musée, architect Fred Lebensold closed the main doors and inserted a new double-ended entrance under the monumental staircase. In lieu of ‘being uplifted physically into a temple of art’, visitors instead went through revolving doors located under bubble domes on either side of the staircase, and down into a main lobby. Organized in this way, visitors would walk through the museum – and the history of art – chronologically, with the oldest items in the museum’s collection located at the lowest level.

There was a practical concern as well – Lebensold argued the opening and closing of the main doors too radically altered humidity levels within the museum. The grand re-opening of the front doors came about in the summer of 1983 to coincide with a major retrospective on the works of William Bouguereau; it would signal the beginning of a new era for the museum, one of large-scale and very popular exhibits, along with new plans to expand.

William-Adolphe Bouguereau - Parure des Champs : many Montrealers of a certain age are doubtless quite familiar with this painting.
William-Adolphe Bouguereau – Parure des Champs : many Montrealers of a certain age are doubtless quite familiar with this painting.

The Bouguereau exhibit and the desire for a major expansion of the MMFA came at around the same time as Bernard Lammare was appointed president of the museum’s board of directors. He was the major driving force, along with Paul Desmarais, to build the museum’s third pavilion, across from the original pavilion and aforementioned 1976 addition (now known as the Stewart Pavilion). What would become known as the Jean-Noël Desmarais Pavilion (completed in 1991), is known to most people today simply as the primary means by which one enters the MMFA. It’s an immense arch made of the same Vermont marble quarried for the original building’s columns and façade, and is located on the south side of Sherbrooke. Standing on Avenue du Musée looking down, it’s just about all you see; the archway defines your path as always leading back to art. From other points on Sherbrooke, it blends into the background a bit better.

Desmarais Pavilion under construction - 1989
Desmarais Pavilion under construction – 1989
Desmarais Pavilion under construction - 1990
Desmarais Pavilion under construction – 1990

I’ve always been intrigued by Moshe Safdie’s Desmarais Pavilion because the most obvious and monumental portion – that of the glass-atrium entrance – isn’t a gallery and doesn’t really involve any art. It’s more like a foyer, a controlled and separate environment where a combination of environmental effects give the impression of grandeur without drawing your eye to any one particular element. You’re simply standing in a deceptively large room that leads to anywhere and everywhere. I feel this impression is emphasized by the notorious staircase that forces visitors to move at half-speed. The galleries, bookshop, restaurant and assorted offices and classrooms are all ‘hidden’ behind the white-marble ‘entrance cube’ and the adjacent remaining façade walls of the New Sherbrooke Apartments, built in 1905 and integrated into the Desmarais Pavilion after a fair bit of lobbying on the part of heritage activists like Phyllis Lambert.

Top: Safdie's first proposal, assuming the demolition of the New Sherbrooke Apartments. Bottom, the integrated approach, keeping the façade of the Beaux-Arts styled apartment-hotel built in 1905.
Top: Safdie’s first proposal, assuming the demolition of the New Sherbrooke Apartments. Bottom, the integrated approach, keeping the façade of the Beaux-Arts styled apartment-hotel.

Lamarre initially wanted to have the remnants of the New Sherbrooke razed so that Safdie could have a clean slate and create something modern and monumental. Opposition to this idea came not only from heritage activists like Lambert, but also from then-new mayor Jean Doré, who had promised greater public consultation when it came to major urban redevelopment projects. Ultimately, with the excellent examples of Maison Alcan and the Canadian Centre for Architecture perhaps providing some additional motivation, it was decided the new pavilion would integrate the façade of the New Sherbrooke, despite the additional complications of having to work around supporting beams. The end result was widely praised, a nice balance of the modern and innovative combined with the protection and renewal of the antique; new inserted into old without much disturbance.

In the span of 20 years the MMFA changed its front entrance three times, but with the Desmarais Pavilion, it finally had something people seemed to really like. Attendance began to rise steadily and has been high ever since. For the past two years, the MMFA has held the title of most-visited arts museum in all of Canada.

So who knows, maybe there really was something to be said for putting the entrance at street level and closer to the people. If the museum’s attendance numbers continue to rise, I suspect they may need to open more doors.

City hypocrisy re: wood burning ban?

Fire pit, Place Jacques Cartier - January 2016

I snapped the photo above in Place Jacques Cartier a few days back. It is a fire pit, one of several located near Rue de la Commune and intended to provide a place to warm up for all those out enjoying the many and diverse activities on-going throughout the Old Port and Old Montreal this winter. It was a quaint scene, doubtless intended to remind tourists of our hearty Colonial past. Nearby, a calèche driver enrobed in a buffalo hide stood next to his massive, steaming steed, educating passersby that his was the original Uber. Adirondack chairs of fresh-cut pine surrounded the flaming hearths. Everyone seemed to be enjoying themselves.

So naturally the powers at be want this to end… or so I thought. The city has plans to ban fireplaces and other wood burning stoves and fire pits because they pollute.

While the ban is still two years off, I was a touch perplexed. This was all happening within eyesight of City Hall and both major parties seem to be really gung-ho on expediting the ban. Wouldn’t they have at least thought about ensuring there aren’t any fire pits at public events in the lead-up? What kind of message does this send to the people? Are they bad for the environment or can fireplaces distinguish between private use and public? Perhaps burning wood emits less particulate in the context of being decorations to support our tourism industry?

Banning things is, unfortunately, just about the only thing municipal and provincial governments seem to be good at these days. In addition to the fireplace ban, the province recently decided to ban cigarettes from outdoor patios and e-cigarettes from anywhere indoors. E-cigarettes, by their very definition, do not involve any burning tobacco whatsoever.

The bans are all intended to improve air quality and make us healthier, but they’re illogical when put in context of what’s causing far, far worse air pollution. Even if everyone in Montreal decided to light up a smoke and their fireplaces simultaneously, the pollution still wouldn’t even come close to what’s produced by all the cars, trucks, busses and airplanes going in and out of our city every single day. You and everyone else living in this city could get cracking on being pack-a-day smokers for the rest your lives and it will wouldn’t come close.

This type of legislation tends to get near unanimous approval from other politicians and, even though people do grumble and complain these bans are invasive and unnecessary, it’s unlikely public opposition will be so strong there’ll be any street protests.

In other words, it’s a safe bet everyone will go along with the plan and whomever’s in power looks like they’re doing something productive.

Banning cars and trucks, no matter how effective a solution to the air-quality and smog problem, would be political suicide. So that’s not going to happen.

In the end, what we really need is the political will to secure massive investments in public transit, like a new light-rail system and (not or) a major expansion of the Métro.

It would also be great if all the highway trenches were covered over too, given much of our local smog is generated by ground-up salt and sand used to clear the streets after snowstorms. Covering over the Decarie and Ville-Marie Expressways wouldn’t just ensure they’d be permanently clear and unaffected by the elements, but further wouldn’t require snow clearance. And the exhaust within can be sucked out and cleaned too.

But in order for any of this to be possible, we have to get comfortable with the knowledge small, bandaid feel-good solutions won’t do an iota of good to improve our local environment and cut down on smog.

The idea that your fireplace is a major contributor to environmental degradation is, apparently, not even really taken seriously by whichever city department was responsible for setting up these hearths.

Iconic Montreal Architecture – Complexe Desjardins

A quick summation before my screed. Here’s why I think Complexe Desjardins is an exceptional example of Montreal architecture:

1. It’s balanced without being symmetrical. The four towers are of different heights, ascending clockwise like a giant staircase. The tallest tower is built on the lowest ground, the shortest tower is built on the highest. The illusion this creates makes the towers seem shorter when viewed from the north, and taller when viewed from the south. Finally, the four towers are each offset from the centre of the podiums they’re set on. The arrangement was intended to give the impression of a city within the city, buildings in harmony without much indication it’s a single common development.

2. It occupies a pivotal and central section of the city’s Underground City, as well as a central ‘institutional axis’ running north-south from Sherbrooke all the way down into Old Montreal. It connects provincial and federal government offices with housing and hotels, office and retail space to university buildings, an arts museum, concert hall and diverse other performance venues, Métro stations and parking garages to a convention centre and the World Trade Centre. Few other buildings in Montreal connect as many diverse services and purposes as Complexe Desjardins.

3. The large central atrium is essentially a public city square, protected from the elements and inclement weather by massive glass walls. The natural lighting emphasizes the interior volume without making it feel heavy – which is difficult to do with so much concrete. Combined with captured body heat cycled through between the Métro stations, not to mention the fountain and plants, the atrium has an almost tropical feel, especially in the dead of winter. Complexe Desjardins was the only ‘superblock’ built in that era with a public space at its centre and further, specifically designed to facilitate pedestrian traffic and draw it in off the streets.

Complexe Desjardins, August 1976 - Archives de Montréal. In the foreground, the Ville Marie Expressway and what remained of Chinatown. In the background, the controversial La Cité complex is under construction.
Complexe Desjardins, August 1976 РArchives de Montr̩al. In the foreground, the Ville Marie Expressway and what remained of Chinatown. In the background, the controversial La Cit̩ complex is under construction.

If you don’t know Complexe Desjardins already, just wait for a cloudy night and look towards the city centre. The hazy green light hanging low in the sky will lead you right to it. Complexe Desjardins completed a facelift recently that involved adding a massive lighting installation that now bathes the complex’s office towers in a brilliant emerald glow. The lighting scheme devised by Lightemotion projects a ‘luminous pathway’ drawing attention to the Quartier des Spectacles from afar and identifies the buildings as belonging to the Desjardins Movement by using their trademark colour. It’s excellent advertising, but I hope it doesn’t catch on. Two beacons are enough.

I feel this new lighting scheme is appropriate, like we’ve established a kind of balance to our city’s night-lights. The Royal Bank of Canada, the nation’s largest bank, has a rotating beacon atop their head office at Place Ville Marie. The Desjardins Movement, North America’s largest credit-union, now also commands a place in our night sky.

I make mention of this comparison between PVM and Complexe Desjardins for a reason – the latter was built to ‘balance’ the former.

Together, Place Ville Marie and Complexe Desjardins form useful ‘bookends’ of Montreal’s ‘edifice complex era’ – a period in time in which urban development was almost exclusively of massive scale and often intended to include all manner of activity within an ostensibly cohesive mega-structures. Between 1958 and 1977 Montreal got its Métro system, hosted Expo 67 and the 1976 Summer Games. Massive multi-purpose complexes occupying entire city blocks were constructed all throughout this period – Westmount Square, Place Alexis-Nihon, Place Victoria, Place Dupuis and the La Cité complex in Milton-Parc to name but a few.

Complexe Desjardins and Place Ville Marie are arguably the best overall examples of the then popular ‘superblock’; though they are nearly opposite constructions in terms of their form, both managed to greatly surpass expectations in terms of the functions they play within Montreal’s urban environment. These are complimentary structures; dissimilar, asymmetric and yet somehow harmonious and balanced as well.

The first ICAO Headquarters, upon completion in 1949. In the background, the office tower and annex of Bell Canada. At far right, part of CN's Central Station
The first ICAO Headquarters, upon completion in 1949. In the background, the office tower and annex of Bell Canada. At far right, part of CN’s Central Station

In the late 1950s and early 1960s several large buildings were constructed in quick succession in proximity to Montreal’s largest and most important train stations. Canadian National Railways owned a considerable amount of land along a north-south axis running from Saint Catherine Street down to Saint Antoine between University and Mansfield, and by the end of the last war there was considerable interest in developing it to relieve congestion in Old Montreal.

There were other reasons to develop CN’s land. For much of the 20th century, the land north of René Lévesque Boulevard was a large open pit with Central Station’s rail yard at its bottom. Beginning in the late 1940s CN began to develop the site, first building a permanent home for the International Civil Aviation Organization (ICAO) then followed by the Queen Elizabeth Hotel and CN’s head office. By mid-decade CN had turned its attention to the pit and endeavoured to build an office complex of several buildings of different heights, set around a public plaza, and integrated into the Central Station complex. The undertaking was absolutely massive: the pit was so large there’s an amount of space underground equivalent to all the rentable space in the tower and buildings above. Place Ville Marie was Montreal’s first ‘city within the city’ styled developments.

By 1962 the cruciform tower of Place Ville Marie had been completed, a massive ‘tear’ in the urban fabric had been mended, and a new modern city centre was taking shape in the far western districts of the city. The Royal Bank of Canada was involved from the start and became the tower’s anchor tenant. Not to be outdone, the Canadian Imperial Bank of Commerce decided to build their own Internationalist-styled tower just two blocks further west at the same time, the projects competing against one another in terms of height (and on this note, though today neither are Montreal’s tallest towers, they each held the title of tallest in Canada and the British Commonwealth between 1962 and 1964. Both are often mistaken for Montreal’s tallest to this day: the CIBC Tower is slender and features a prominent antenna, while PVM is built on higher ground than any other skyscraper in the city).

Montreal early 1960s, with CIBC Tower, Place Ville Marie and CIL House under construction.
Montreal early 1960s, with CIBC Tower, Place Ville Marie and CIL House under construction.

In a matter of a few years a tectonic shift had occurred in Montreal, re-locating the city’s central business district from Saint James Street in Old Montreal to the environs of Dorchester Square to the northwest. By 1970, several other major developments had taken place within the vicinity of the city’s main train stations, including Skidmore, Owings and Merrill’s CIL House at the southeast corner of University and René Lévesque, Terminal Tower at 800 René Lévesque, Place du Canada and the Chateau Champlain hotel across from Windsor Station on Peel Street and Place Bonaventure, the city’s first purpose-built convention centre, immediately south of the Central Station complex. These buildings were connected directly not only to the city’s train stations and commuter-rail network, but also to each other and to Montreal’s new Métro system, giving us the very first iteration of our Underground City.

Complexe Desjardins evolved to provide a counter-weight to this development. Whereas the aforementioned buildings were largely financed and driven by the city’s Anglo-American business community, Complexe Desjardins would become the physical manifestation of the ascending Francophone middle-class and Quebec, Inc. By the mid-1960s the Desjardins Group had grown to become one of the nation’s largest financial institutions and was looking for a new head office in downtown Montreal. The Quebec government was also looking for modern downtown office space, and the City of Montreal was keen to ‘pull’ the business centre back towards the east, closer to the seat of municipal power and the traditional ‘centre’ of city affairs.

Finishing touches to Complexe Desjardins, 1976. Dufferin Square had become the parking lot at bottom centre.
Finishing touches to Complexe Desjardins, 1976. Dufferin Square had become the parking lot at bottom centre.

What was created was essentially the opposite of Place Ville Marie. Whereas PVM exploited the aerial rights over a train yard, Complexe Desjardins evolved out of what was once parts of Chinatown and the Red Light District (slum clearance initiatives from the 50s had left the area in near ruin). Consider as well, PVM’s main tower is essentially four skyscrapers gathered around a central service core with its plaza offset, whereas Complexe Desjardins is composed of four separate towers organized on pedestals around a glass-atrium covered plaza. PVM is defined by its tallest tower, a look emphasized by the much smaller buildings gathered around it. Complexe Desjardins’ towers ascend like a staircase – its tallest being just seven floors shorter than PVM 1, and appearing shorter than it actually is. Whereas the former dominates the skyline on high ground, the latter assembly of buildings seems far more balanced, working with one another rather than placed in obvious opposition to each other.

Complexe Desjardins is also, complex (ahem), in terms of what jobs it performs in the context of Montreal’s urban environment. It’s a private commercial property conceived as a public space. The complex forms the central section of Montreal’s eastern institutional axis, beginning with UQAM up at Sherbrooke, then moving through Place des Arts and then on to Complexe Guy-Favreau and the Palais des Congrès & World Trade Centre in Old Montreal.

Integrated, international business services in the west, integrated, local civil services to the east.

Balanced.

We haven’t really built anything like Complexe Desjardins in 40 years, and this isn’t altogether a bad thing, though some insist a lack of construction of this magnitude is a sign of economic weakness. Edifices like Complexe Desjardins come from a specific moment in time responding to the needs of a particular era. That it continues to serve in its intended role, that it has evolved with tastes and maintained its presence and importance within the urban environment is a far better indicator of the project’s success than any attempt at emulation.

Québec to foot $76 million cost of Vendome Station upgrade

Bird's eye perspective on the new entrance

Big news for NDG and the owners of that big empty lot on the corner of Claremont and Boul. de Maisonneuve.

It looks like the province is pushing ahead with a plan to build a second entrance to Vendome Métro station for a cool $76.5 million by 2019.

The province’s plan is to connect the station platforms to an new entrance to be located on the ground floor of the small office building immediately east of the station, where the MUHC maintains some of its offices. The full scope of the plan involves construction of a new tunnel to link the hospital and train station with the Métro station, and to build a ‘universally accessible’ entrance at the eastern end of the Métro station’s platform.

From the looks of things, I think this will result in a unique Métro station design in terms of the placement of exits from platform level: most if not all other stations that have more than one exit from platform level have the exits located at either end of the platform. The new Vendome will have an exit at the far eastern end and the other (extant exit) located about a quarter the overall platform length from the west end of the platform.

I’m not mentioning this because there’s any particular problem with it… the point is that, as far as I remember, all Montreal Métro stations are supposed to be laid out in such a fashion that they’re all distinct in terms of their layouts and ‘feel’ so as to facilitate travel for citizens with visual impairments. I hope this overarching design concept is retained for Vendome’s redesign.

According to transport minister Robert Poeti, the intention is to make the station ‘universally accessible’, though in the press release there was no specific mention of building elevators to ferry passengers with reduced mobility between the platform level and ground level. The press release also states that the Quebec government is ‘proud’ to finance the whole thing.

No kidding… pride? What an odd emotion to state in relation to an infrastructure project…

In other contexts it sounds just as weird… “I’m proud to announce the province will pay the full cost of building this lunatic asylum” or “I’m proud to say we’ll be financing the total cost of wastewater treatment” or “I am proud to spend your money fixing problems our lack of foresight caused in the first place…”

In any event, I digress.

Installing elevators for the specific purpose of making all stations accessible to those with reduced mobility is one of the STM’s long-term goals, though it’s been *ahem* handicapped by a wide variety of complicating factors not uniquely limited to the difficulties of punching holes into walls and floors… in at least one case I can think of a private property that serves as a primary entrance to another Métro station has retarded the effort to make a station universally accessible by delaying the construction of elevators inside its foyer.

Without more specific details I can imagine one of three scenarios for Vendome station. Either elevators will allow access from the new east exit, or the tunnel connecting to the Glen Yards Super(duper)hospital will connect directly to the platform, or some combination of both options.

Connecting directly to the platform is the best option for anyone with mobility problems, not to mention the best way to contend with the anticipated increase in the station’s use if the increase is driven by those seeking to access the hospital.

The transport ministry, in their consultation with the AMT, STM and MUHC, believes that the number of users will increase from 9 million to 18 million annually between now and 2021.

However, if the increase in ridership at Vendome station is not driven principally by hospital access, and instead is a reflection of traffic congestion in the West End more generally speaking, building a second entrance will only help with entrance and egress, not accessibility. And not by much either: the bus depot will still be located around the western entrance, and the over-crowding problem at Vendome could only be solved by running more M̩tro trains and buses. If the increase in station usage is being driven by people needing access to the M̩tro system (and not the hospital), then a second entrance would make a lot of sense Рif it was located to the west where the bus depot and train station access points already exist.

The green space across the parking lot is supposed to become a grocery store/ seniors' residence. It's accessibility will be greatly improved with the new Métro entrance...
The green space across the parking lot is supposed to become a grocery store/ seniors’ residence. It’s accessibility will be greatly improved with the new Métro entrance…

The project is currently estimated to cost $76.5 million, and this cost will be paid by the provincial transport ministry. The project will be managed by the STM; construction will begin in 2017 and is expected to be completed by the summer of 2019.

You may be wondering, isn’t there already a tunnel connecting the Métro to the MUHC?

Answer: sorta.

A $5 million ‘temporary’ tunnel was completed in June of 2015 that extended an existing tunnel (that links the Vendome Métro station mezzanine with the Vendome commuter train station) towards the MUHC. Underground it connects to the MUHC’s parking garage, though it’s only an emergency exit out of the garage and into the tunnel. For those wishing to access the hospital, they need to climb a staircase (or take an elevator) and exit a kiosk located roughly 100 meters from the hospital’s front entrance.

For reasons that remain unexplained, though connecting the hospital to the Vendome intermodal station was always part of the theoretical plan, making the station a) universally accessible and b) connect directly to the hospital, never materialized as one might expect.

I should reiterate: the extant ‘temporary’ tunnel does indeed connect directly to the hospital’s underground parking garage and this garage in turn is universally accessible (i.e. served by multiple elevators). The MUHC’s CEO, Normand Rinfret, was quoted by CBC Montreal back in June of 2015 as saying, with reference to this off-limits connection:

“It’s not a door that is conceived as a wall and everything related to massive transportation means for people to get access.”

Uh-huh…

My guess is that either the people running the MUHC don’t want to pay for some additional security measures that would be required to make use of this existing access point, or they don’t like the notion of people walking through a parking garage to get into the hospital.

Proposed tunnel to connect MUHC with MUHC office space
Proposed tunnel to connect MUHC with MUHC office space

Whatever the reason, there’s no good one as far as I’m concerned. The simplest and least expensive solution to connect the hospital with the intermodal station is to use the tunnel that’s already built.

Furthermore, are we not supposed to be in a period of government austerity? Spending more than 15 times the cost of the existing tunnel on this project is a colossal expense of dubious benefit.

So let me tell you about Québec’s national sport.

The objective is very straightforward; all you need to do to win is to ‘invest’ as much public money while in government as you possibly can, and extra points are earned if a) cost projections are wildly inaccurate, b) the end product looks nothing like what was originally proposed, c) a Quebec-based company with a history of fraudulent business practices and/or poor corporate governance is somehow involved and d) if the shortcomings of an earlier government’s project can somehow be rolled into an entirely new and separate project that keeps the process repeating ad infinitum.

This is not a province that has spending under control. There is no economic conservatism in Quebec in the traditional sense, and the neoliberalism adopted by the Quebec Liberals as a de facto economic policy has only served to decease the overall value of the province’s exceptionally high rates of taxation.

We elect governments that promise to invest public money to stimulate the Quebec economy, but all too often it seems that we’re spending money for the purposes of spending money, and perhaps worse we elect governments (consistently) that take public tax wealth to redistribute to private interests that have become dependent on corporate welfare to survive (see Bombardier Aerospace). Taxation in our case is the economic foundation of our own elites. It funds our local aristocracy.

I have no issue with making Métro stations accessible, but let’s be real – this has more to do with spending money on ‘legacy projects’ than finding simple solutions to accessibility problems. As I said before, a tunnel already exists. Someone at the MUHC took a dump on the notion of having people access the hospital through the parking garage and so the powers at be have conspired to build something new and expensive rather than simply tell the MUHC to deal with it and use the tunnel they have.

And it would have gone that way had it not been for the fact that the MUHC is being run by a for-profit organization whose sole responsibility is to milk as much money from the public purse as it possibly can.

Somehow that’s supposed to be good for taxpayers.

Children’s Hospital Field at Cabot Square®

Ceci n'est pas une stade de baseball...
Ceci n’est pas une stade de baseball…

Urban development news of the day: the former Montreal Children’s Hospital building at Cabot Square has been sold to real estate developer Luc Poirier for an undisclosed sum. The MUHC’s asking price, as reported a few months back, was about $45 million, though neither Poirier or the MUHC would confirm the value of the transaction (which is odd given that we’re talking about a public building and everyone’s talking a good game these days about transparency… but I digress).

Luc Poirier also won’t specify exactly what he has in mind for the site, though he hinted strongly at a baseball stadium. Apparently he has an important meeting this week with someone of significance vis-a-vis the much bandied about plan to return professional baseball to the city.

Now before we get ahead of ourselves, nothing is set in stone. The deal won’t be official for another three months, at which time the public will be told how much the hospital sold for. Poirier has no specific plan for the site. Inasmuch as he indicated he believes it’s an ideal site for a downtown ballpark, he remains open to myriad other potential uses. He offered condos, offices or a seniors residence as possibilities. That being said, his plan involves demolishing the six buildings that comprise the hospital complex, as he believes the buildings are insufficient as is for housing.

As to a professional baseball stadium, Poirier was very candid in stating a new ballpark would require not only demolishing the hospital buildings, but further would require expropriating at least some of the streets and public spaces (i.e. the newly renovated Cabot Square and Place Hector-Toe-Blake and Place Henri-Dunant) that surround the hospital complex.

Ergo, not only does the public lose institutional space in the form of a hospital, but further loses three parks. Cabot Square just received a $6.3 million renovation, paid for by the city. If Poirier’s plan for a baseball stadium gets the green light, it would not only waste that sum but further require extensive city involvement, consuming public tax dollars for a private interest.

Assume the new ballpark would occupy the grounds of the former Children’s Hospital, the three aforementioned parks and public spaces, as well as Sussex, Hope, Tupper and Lambert Closse streets. The city would have to plan for the loss of those side streets, not to mention re-locate the bus terminus co-located at Cabot Square. If you thought there wasn’t enough parking in downtown Montreal to begin with, imagine the loss of those parking on those streets compounding additional parking requirements on game days.

Even if Poirier plans for an extensive excavation of the land to build a massive underground parking garage to compensate for parking demands, building a ballpark on this site will still require additional roadwork on Atwater, Sainte-Catherine and René-Lévesque to accommodate higher traffic loads. I can’t imagine how the city could this and also somehow make Sainte-Catherine more pedestrian friendly simultaneously.

A major advantage of course would be that this location would provide immediate access to Atwater Métro station, which would in all likelihood help mitigate traffic congestion (though by no means would it eliminate it). Atwater is an ideal Métro station because it was designed from the outset as a high-capacity inter-modal transit station (Bus/Métro) adjacent to a major sporting and performance venue (the Forum). But we could count on congestion there too. If the exhibition games at the Olympic Stadium over the past two years were any indication, the Green Line would slow down considerably on game days (though this would be mitigated at least in part with people opting to disembark either at Lionel-Groulx or Guy-Concordia). All told, it’s not a bad location strictly in terms in terms of access to public transit infrastructure.

But the project’s various public costs can’t be overlooked simply because the stadium will be Métro station adjacent.

My major concern is the immediate effect a stadium will have on residential and retail rents in the Shaughnessy Village area. My fear is that commercial rents will rise very quickly, forcing out small businesses and replacing them with theme restaurants, high-capacity sports bars (à la Sergakis) and tacky souvenir stands. Residential rents will also rise, eventually leading property owners to convert their properties into condominium towers, which in turn would likely force out many residents.

***

The latest word is that the city is not keen on Mr. Poirier’s plan.

Richard Bergeron, formerly the leader of Projet Montréal and now Coderre’s right-hand man on all aspects of downtown redevelopment, said he’s not in favour and that the city is not ready to sacrifice public spaces and streets for a ballpark.

Bergeron also noted that the Children’s Hospital site, though promoted by Ernst & Young in their feasibility study, is not the first choice for the Montreal Baseball Project, which in turn prefers the Peel Basin.

Bergeron also stated that yet another site had been pitched to City Hall – that of Maison Radio-Canada’s extensive parking lot. Bergeron suggested the western lot, which runs between René Lévesque Boulevard and the Ville Marie Expressway along Wolfe. The eastern lot is much larger, but might not be as feasible simply as a result of congestion on Papineau (police operate the traffic lights manually on much of Papineau throughout the day).

All that being said, this proposal makes much more sense to me. For one, no expropriations of public space nor demolitions of any heritage structures; the lots currently constitute empty space. A ballpark at this location would still require excavations and a significant underground parking facility, but wouldn’t ‘spill over’ into the surrounding streets such as it would over at the Children’s. Even though this would also be a small-sized ballpark, there could be some integration with Maison Radio-Canada, such as incorporating seating atop the complex’s westernmost studios, if extra space is required.

Other benefits of this location: adjacent to established entertainment districts (i.e. Gay Village, Old Montreal) though not immediately next door. Four Métro stations within a five minute walk, including the Berri-UQAM, not to mention highway and bridge access. Fringe benefits: CBC/Radio-Canada and Molson gets free advertising.

All that being said, I’m anxious to find out who Mr. Poirier was supposed to meet with and what those discussions lead to.